15.11.2013 Views

Unified Land Development Code - Town of Gilbert

Unified Land Development Code - Town of Gilbert

Unified Land Development Code - Town of Gilbert

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

E.<br />

Wireless<br />

communication<br />

facilities<br />

8.21.A. Co-<br />

Location<br />

Zoning<br />

districts<br />

I-I, 1-2, 1-3,<br />

C-l, C-2,<br />

PSC-l, PSC-2,<br />

govt. property<br />

and churches<br />

Height<br />

No greater<br />

than existing<br />

structure<br />

Setback from<br />

residential<br />

110% <strong>of</strong><br />

Height or<br />

ULDC Req.s;<br />

min. <strong>of</strong> 75 feet<br />

Permits<br />

Process Review by: Appeal<br />

AUP<br />

AUPwlRC<br />

Staff<br />

RC<br />

DRB<br />

TC<br />

*Use /<br />

Remove<br />

10 years/3<br />

mos.<br />

*Must use issued permit in twelve months and remove facilities three months after abandonment. AUP =<br />

Administrative Use Permit<br />

CUP = Conditional Use Permit<br />

DRB = Design Review Board<br />

RC = Redevelopment Commission<br />

TC = <strong>Town</strong> Council<br />

(Ord. No. 1059, 9-16-97)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!