1.51 GILBERT UNIFIED LAND DEVELOPMENT CODE<br />

B. Approval process.<br />

Site Plan approval shall be required in accordance with Chapter II prior to<br />

construction.<br />

C. Performance standards. Uses in this district shall be in full conformance with the standards <strong>of</strong><br />

this and other applicable sections <strong>of</strong> this <strong>Code</strong>:<br />

1. Hours <strong>of</strong> operation shall not extend beyond 8 a.m. to 10 p.m., Monday through Friday,<br />

with reduced hours on the weekend.<br />

Longer hours <strong>of</strong> operation may be granted and extension <strong>of</strong> hours <strong>of</strong> operation may<br />

be allowed for special activities after approval <strong>of</strong> an Administrative Use Permit if there<br />

are findings which justify the extension will better serve, and not negatively impact the<br />

adjacent neighborhood.<br />

2. All activity to be conducted within an enclosed building.<br />

3. Principal vehicle access to and from the site shall be via a primary driveway.<br />

4. All mechanical noise shall be muffled so as not to become objectionable to areas zoned<br />

for residential use due to intermittence, beat frequency or shrillness. Noise may equal<br />

but not exceed average street traffic noise. Measurement <strong>of</strong> noise levels shall be made<br />

at the zoning district boundary and shall not exceed the sound level <strong>of</strong> the abutting use<br />

district or the street abutting such use, whichever<br />

is greater.<br />

5. See Section 1.65, Table <strong>of</strong> Bulk, Building and <strong>Land</strong>scape Setback Requirements for<br />

Non-Residential Districts, for the building and landscape setbacks, height, building<br />

coverage, and the minimum and maximum lot area.<br />

6. The exterior design <strong>of</strong> any building shall be compatible with the design and character<br />

<strong>of</strong> residential buildings in an adjacent and/or surrounding residential<br />

district.<br />

7. A phasing plan for the installation <strong>of</strong> utilities, stormwater retention, and landscaped<br />

setbacks is required at the time <strong>of</strong> site plan approval.<br />

D. <strong>Development</strong> policy. The following are used as policy directions adopted by the <strong>Town</strong> to<br />

evaluate project quality within this district:<br />

1. A direct pedestrian connection to the adjacent neighborhood and planned mass transit<br />

is preferred.<br />

2. The project should be designed in such a way that it is interesting for the pedestrian.<br />

This shall be obtained through the creation <strong>of</strong> plazas, fountains, and building details<br />

provided at eye level. The parking lot shall not be the dominant<br />

design feature <strong>of</strong> the site plan.<br />

3. To assure compatibility between commercial and residential land uses transitional<br />

zoning techniques may be required as outlined in the Bufferyard Policy<br />

contained in Chapter II.<br />

4. Driveway locations and dimensions should meet the standards described in Appendix<br />

E, Standard Details.<br />

Ch. I, Pg. 28