Table VI-7 provides a <strong>com</strong>parison of the current IRC LOS, the LOS standard, the average<br />

LOS of other Florida counties, and the standards established by the FLA. It should be<br />

noted that IRC’s current LOS in terms of library facilities, materials, and <strong>com</strong>puters<br />

ranges from 24 percent to 43 percent above the average LOS of other Florida counties.<br />

Table VI-7<br />

Comparison of Current LOS and LOS Standards<br />

(Per 1,000 Residents)<br />

Per 1,000 Residents<br />

LOS Measure<br />

IRC<br />

Existing<br />

LOS (1)<br />

Avg of Other<br />

FL Counties<br />

LOS (2)<br />

% Difference:<br />

IRC Existing<br />

LOS & Other<br />

Florida Counties<br />

FLA LOS<br />

Standards (3)<br />

Library Buildings (sq. feet) 580 438 24% 600 to 1,000<br />

Library Materials (4) 3,200 1,982 38% 2,000 to 4,000<br />

Computers 0.7 0.4 43% 0.3 to 1.0<br />

(1) Source: Table VI-4<br />

(2) Includes all Florida counties, except for IRC. Source: Department of State – Division of<br />

Library & Information Services, 2002 Library Directory with Statistics<br />

(3) Source: Table VI-5<br />

(4) Library materials for IRC include books, CDs, DVDs, videos, print and online resource<br />

subscriptions. Library materials for other counties include books, serial subscriptions,<br />

audio and video volumes.<br />

Note: IRC figures are for 2004 while the figures for other Florida counties are for 2002.<br />

Cost Component<br />

Library capital costs consist of four <strong>com</strong>ponents: buildings, land, materials, and<br />

equipment. Facility costs are based on the projected cost to add the next library building<br />

(includes building and land cost), while the cost of library materials and equipment is<br />

based on the average replacement cost per unit, provided by the IRC Division of Library<br />

Services.<br />

Buildings and Land<br />

The following two tables provide unit costs for buildings and land. Since replacement<br />

costs for the existing buildings were not readily available, building costs were determined<br />

from recent expansions and future planned expansions, as presented in Table VI-8. The<br />

construction cost ranges from $135 to $189 per square foot, while the furniture and<br />

equipment cost ranges from $48 to $114 per square foot. According to IRC Library<br />

System representatives, the relatively high cost of the Main Library expansion was due to<br />

a more sophisticated building structure, high demolition costs in preparation for<br />

expansion, and relatively high furniture and equipment costs.<br />

Tindale-Oliver & Associates, Inc.<br />

<strong>Indian</strong> <strong>River</strong> <strong>County</strong><br />

May 2005 VI-9 <strong>Impact</strong> <strong>Fee</strong> <strong>Study</strong>