(1) Source: Section II, Table II-1<br />

(2) Source: Table VI-4<br />

(3) LOS standard (Item 2) multiplied by 2025 population (Item 1) divided by<br />

1,000.<br />

(4) Source: Table VI-1<br />

(5) Necessary building space (Item 3) less existing building space (Item 4)<br />

(6) Source: Table VI-10<br />

(7) Additional building space needed (Item 5) multiplied by building and land<br />

cost per square foot (Item 6).<br />

(8) Source: Table VI-4<br />

(9) LOS standard for materials (Item 8) multiplied by 2025 population (Item 1)<br />

divided by 1,000.<br />

(10) Source: Table VI-2<br />

(11) Necessary library materials (Item 9) less existing library materials (Item<br />

10).<br />

(12) Source: Table VI-11<br />

(13) Additional library materials needed (Item 11) multiplied by library material<br />

unit cost (Item 12).<br />

(14) Source: Table VI-4<br />

(15) LOS standard for <strong>com</strong>puters (Item 14) multiplied by 2025 population (Item<br />

1) divided by 1,000.<br />

(16) Source: Table VI-3<br />

(17) Necessary <strong>com</strong>puters (Item 15) less existing <strong>com</strong>puters (Item 16).<br />

(18) Source: Table VI-12<br />

(19) Additional <strong>com</strong>puters needed (Item 17) multiplied by cost per <strong>com</strong>puter<br />

(Item 18).<br />

(20) Source: Table VI-4<br />

(21) LOS standard for other equipment (Item 20) multiplied by 2025 population<br />

(Item 1) divided by 1,000.<br />

(22) Source: Table VI-3<br />

(23) Necessary other equipment (Item 21) less existing other equipment (Item<br />

22).<br />

(24) Source: Table VI-12<br />

(25) Additional other equipment needed (Item 23) multiplied by cost per other<br />

equipment (Item 24).<br />

(26) Sum of total <strong>com</strong>puter cost (Item 19) and total other equipment cost (Item<br />

25).<br />

(27) Sum of total buildings and land cost (Item 7), materials cost (Item 13), and<br />

total equipment cost (Item 26).<br />

(28) Source: Table VI-14<br />

(29) Total building, land, materials, and equipment cost (Item 27) less<br />

programmed funds over the next five years (Item 28).<br />

To ac<strong>com</strong>modate 2025 demand for library buildings, the <strong>County</strong> needs to provide 39,831<br />

square feet of additional library building space. The construction of the 32,000-square<br />

foot Branch Library will not be sufficient to ac<strong>com</strong>modate this demand. Based on<br />

building and land costs estimated in this report, additional square feet will require an<br />

investment of $10.1 million. Library materials and equipment will require an additional<br />

$9.7 million. The <strong>County</strong> programmed $3.3 million for library capital expenditures over<br />

Tindale-Oliver & Associates, Inc.<br />

<strong>Indian</strong> <strong>River</strong> <strong>County</strong><br />

May 2005 VI-22 <strong>Impact</strong> <strong>Fee</strong> <strong>Study</strong>