10.01.2015 Views

Indian River County Impact Fee Study Final Report - irccdd.com

Indian River County Impact Fee Study Final Report - irccdd.com

Indian River County Impact Fee Study Final Report - irccdd.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Proposed School <strong>Impact</strong> <strong>Fee</strong> Schedule<br />

To determine the proposed school impact fee for each residential land use, the net impact<br />

cost per student, from Table IX-7, is multiplied by the student generation rate for each<br />

residential use, from Table IX-8. The resulting net impact fees per residential use type<br />

are presented in the proposed impact fee schedule in Table IX-9 below.<br />

Table IX-9<br />

Proposed School <strong>Impact</strong> <strong>Fee</strong> Schedule<br />

Residential Land Use<br />

<strong>Impact</strong><br />

Unit<br />

Net <strong>Impact</strong> Cost<br />

per Student (1)<br />

Students<br />

per Unit (2)<br />

Net Cost<br />

per Unit (3)<br />

Administrative<br />

<strong>Fee</strong> (4)<br />

Total <strong>Impact</strong><br />

<strong>Fee</strong> (5)<br />

Single Family du $5,321.08 0.330 $1,755.96 $52.68 $1,808.64<br />

Accessory Single Family du $5,321.08 0.094 $500.18 $15.01 $515.19<br />

Multi-Family du $5,321.08 0.094 $500.18 $15.01 $515.19<br />

Mobile Home du $5,321.08 0.117 $622.57 $18.68<br />

(1) Source: Table IX-7<br />

$641.24<br />

(2) Source: Table IX-8<br />

(3) Net impact cost per unit is the product of the net impact cost per student (Item 1) and the<br />

number of students per unit (Item 2).<br />

(4) An administrative fee of 3 percent of the net impact fee.<br />

(5) Total impact fee is the sum of the net impact fee (Item 3) and administrative fee (Item 4).<br />

Future Demand Analysis<br />

Future demand projections are based on population projections included in Section II,<br />

Table II-1. Table IX-10 presents the public school facilities demand forecast and<br />

associated cost estimates.<br />

(This space intentionally left blank)<br />

Tindale-Oliver & Associates, Inc.<br />

<strong>Indian</strong> <strong>River</strong> <strong>County</strong><br />

May 2005 IX-15 <strong>Impact</strong> <strong>Fee</strong> <strong>Study</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!