Table VII-1<br />

Land & Buildings Inventory (1)<br />

Facility Description<br />

Location<br />

Year<br />

Acquired/<br />

Built<br />

Number<br />

of Acres<br />

Square<br />

<strong>Fee</strong>t<br />

Land<br />

Replacement<br />

Cost (2)<br />

Building<br />

Replacement<br />

Cost (3)<br />

Fire Station 1 (4) 1500 Old Dixie Hwy, Vero Beach, FL 32960 1986 5.00 16,423 $222,060 $1,300,000<br />

Fire Station 2 3301 Bridge Plaza Dr, Vero Beach, FL 32963 1986 0.92 5,244 $222,060 $1,300,000<br />

Fire Station 3 (5) 2900 43rd Ave, Vero Beach, FL 32960 1986 2.72 3,168 $222,060 $1,300,000<br />

Fire Station 4 1500 9th St SW, Vero Beach, FL 32962 1986 0.72 3,447 $222,060 $1,300,000<br />

Fire Station 5 6585 US 1, Winter Beach, FL 32970 1982 3.98 7,449 $222,060 $1,300,000<br />

Fire Station 6 101 South A1A, Vero Beach, FL 32963 1986 2.20 3,830 $222,060 $1,300,000<br />

Fire Station 7 1215 82nd Ave, Vero Beach, FL 32966 1986 0.50 2,258 $222,060 $1,300,000<br />

Fire Station 8 (6) 1115 Barber St, Sebastian, FL 32958 1999 1.00 6,243 $222,060 $1,300,000<br />

Fire Station 9 1640 US 1, Sebastian, FL 32958 1999 0.38 3,600 $222,060 $1,300,000<br />

Fire Station 10 62 North Broadway, Fellsmere, FL 32948 1996 0.48 5,520 $222,060 $1,300,000<br />

Fire Station 11 2555 93rd St, Vero Beach, FL 32963 2001 1.51 7,612 $222,060 $1,300,000<br />

Planned Station 12 (7) N/A FY 05/06 8.00 N/A $222,060 $1,300,000<br />

Planned Station 13 (7) N/A FY 08/09 N/A N/A $222,060 $1,300,000<br />

Average/Total 2.17 64,794 $2,886,780 $16,900,000<br />

(1) Source: IRC Public Works Department and Office of Management and Budget, IRC<br />

(2) Cost per acre based on the purchase cost of $102,332 per acre, which is the average cost per<br />

acre for recently purchased vacant land parcels of 4 to 6 acres in West IRC. This information<br />

can be found in Appendix B, Table B-1. The cost per acre of $102,332 has been multiplied<br />

by the average parcel size of 2.17 acres for a Fire/EMS station in IRC. The average parcel<br />

size is based on the current IRC inventory listed above for the 12 stations that land has been<br />

purchased for, which includes the land for the 11 existing stations plus an additional 8-acre<br />

parcel of county-owned land located at 43 rd Avenue at 5 St SW that has been set aside as a<br />

site for a future Fire/EMS station.<br />

(3) Based on the current average replacement costs of a new consolidated Fire/EMS facility.<br />

(4) The <strong>County</strong> does not own, but leases land for Station 1. The acreage listed is based on an<br />

estimate of the portion of the parcel that is occupied by the station. EMS/Medical Station #1<br />

has been included as part of Fire Station #1, due to plans to <strong>com</strong>bine the two stations into one<br />

facility in the future.<br />

(5) EMS/Medical Station #3 has been included as part of Fire Station #3, due to plans to <strong>com</strong>bine<br />

the two stations into one facility in the future.<br />

(6) Sebastian Volunteer Fire Department operates out of Station 8.<br />

(7) Planned five-year expansion, which is based on an average replacement cost of a new facility.<br />

Tindale-Oliver & Associates, Inc.<br />

<strong>Indian</strong> <strong>River</strong> <strong>County</strong><br />

May 2005 VII-2 <strong>Impact</strong> <strong>Fee</strong> <strong>Study</strong>