10.01.2015 Views

Indian River County Impact Fee Study Final Report - irccdd.com

Indian River County Impact Fee Study Final Report - irccdd.com

Indian River County Impact Fee Study Final Report - irccdd.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Cost Component<br />

Table V-5<br />

Level of Service Comparison<br />

Current LOS<br />

<strong>County</strong><br />

[Bldg Sq Ft per Resident]<br />

<strong>Indian</strong> <strong>River</strong> (1) 1.99<br />

Martin (2) 2.47<br />

Collier (3) 1.74<br />

St. John's (4) 4.37<br />

Citrus (5) 3.13<br />

(1) Source: Table V-4<br />

(2) Source: Development <strong>Impact</strong> <strong>Fee</strong> Update <strong>Study</strong>.<br />

Martin <strong>County</strong>, July 1999.<br />

(3) Source: General Government Building <strong>Impact</strong> <strong>Fee</strong>s. Collier<br />

<strong>County</strong>, January 2004.<br />

(4) Source: Technical Memorandum on the Methods of Updating <strong>Impact</strong> <strong>Fee</strong>s,<br />

James C. Nicholas, February 1998.<br />

(5) Standard based on information provided in the Citrus <strong>County</strong> Public<br />

Building <strong>Impact</strong> <strong>Fee</strong> Update, December 2004. The LOS standard in<br />

the previous impact fee study is 2.67 square feet per resident.<br />

Historical/Replacement Capital Costs<br />

Table V-6 summarizes the replacement cost per square foot for public buildings in IRC,<br />

including the cost of the building and the land. The building replacement cost per square<br />

foot figures are provided by General Services Department, IRC and are based on architect<br />

estimates for the proposed new <strong>County</strong> administration building and the 43 rd Avenue<br />

Complex, which will replace the existing <strong>County</strong> Administration Building. The cost per<br />

square foot figure for the existing <strong>County</strong> Administration Building of $190 includes<br />

sitework, design, furniture, fixtures, and equipment (FF&E) and architecture and<br />

engineering (A&E) costs. The replacement cost per square foot for all other buildings in<br />

the inventory range from $140 to $162, depending on the type and size of the building<br />

and include a 12-percent cost for FF&E, based on architect estimates. The weighted<br />

average replacement cost per square foot for buildings and land, based on the existing<br />

public building inventory, is shown in Table V-6.<br />

Tindale-Oliver & Associates, Inc.<br />

<strong>Indian</strong> <strong>River</strong> <strong>County</strong><br />

May 2005 V-7 <strong>Impact</strong> <strong>Fee</strong> <strong>Study</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!