Indian River County Impact Fee Study Final Report - irccdd.com
Indian River County Impact Fee Study Final Report - irccdd.com
Indian River County Impact Fee Study Final Report - irccdd.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table X-11<br />
Historical Capital Expenditures – Funding Sources (1)<br />
Project Description<br />
Expansion/ Replacement FY 1998/99 FY 1999/00 FY 2000/01 FY 2001/02 FY 2002/03 FY 2003/04 Six Year Total<br />
General Fund (Parks Divison)<br />
Storage Buildings - Equipment Expansion $4,970 $9,672 $14,642<br />
Round Island Footbridge Replacement $32,000 $32,000<br />
Maint. Equipment (tractors, vehicles, etc.) Replacement $45,986 $106,607 $86,606 $54,359 $68,484 $50,539 $412,581<br />
Maint. Equipment (tractors, vehicles, etc.) Expansion $2,800 $2,800<br />
Total - General Fund $45,986 $106,607 $91,576 $54,359 $78,156 $85,339 $462,023<br />
M.S.T.U. Fund (Recreation)<br />
Gifford Aquatic Center - Lighting Expansion $3,950 $3,950<br />
North <strong>County</strong> Aquatic Center - Equip. Expansion $7,945 $7,945<br />
Other Equipment (vehicles, etc.) Expansion $36,547 $36,547<br />
Other Equipment (vehicles, etc.) Replacement $10,914 $21,879 $24,052 $12,579 $69,424<br />
Storage Building Expansion $4,999 $4,999<br />
Defibrillators Expansion $19,396 $5,090 $24,486<br />
Phone System NCAC Expansion $4,985 $4,985<br />
Mobile Bleachers Expansion $83,060 $83,060<br />
Basketball Goals Expansion $4,000 $4,000<br />
Sports Floor and Covering Expansion $46,600 $46,600<br />
Computer Equipment Expansion $892 $892<br />
Total - M.S.T.U. Fund $10,914 $0 $21,879 $48,447 $66,111 $139,537 $286,888<br />
Shooting Range Construction<br />
Shooting Range Improvements Expansion $91,655 $91,655<br />
Optional Sales Tax<br />
Fairgrounds Electronic Sign Expansion $5,500 $5,500<br />
Agricultural Pavilion #2 Expansion $34,030 $329,878 $167,324 $531,232<br />
North <strong>County</strong> Aquatic Center/ Park Expansion $210,882 $53,884 $5,073,929 $385,406 $5,724,101<br />
Gifford Aquatic Center Expansion $621,006 $1,750 $622,756<br />
Soccer Field Water & Sewer - Fairgrounds Expansion $13,838 $134,946 ($100) $13,368 $162,052<br />
South <strong>County</strong> Park - Phase II Expansion $928 $614,248 $288,156 $903,332<br />
South <strong>County</strong> Park Phase III Expansion $1,700,000 $1,700,000<br />
Donald McDonald Park Expansion $78,673 $213,726 $292,399<br />
Round Island Oceanside Park Expansion $1,127 $862,806 $863,933<br />
Agricultural Expo Building Expansion $34,343 $982,127 $1,016,470<br />
<strong>River</strong>view Park - Sebastian Expansion $200,000 $200,000<br />
Wabasso Causeway Park Replacement $311,638 $586,774 $113,280 $1,011,692<br />
Dale Wimbrow Park Expansion $55,451 $200,465 $255,916<br />
Treasure Shores Playground Equipment Replacement $58,000 $58,000<br />
Mobile Stage Expansion $85,000 $85,000<br />
Portable Restrooms Expansion $26,000 $26,000<br />
Fairgrounds electronic sign Expansion $14,445 $14,445<br />
Lighting at 16th St. Sports Complex Replacement $1,572 $1,572<br />
Painting at <strong>County</strong> Sports Complex Replacement $4,200 $4,200<br />
West Wabasso Park Improvements Replacement $65,485 $65,485<br />
North <strong>County</strong> Park Phase II Expansion $2,145,625 $2,145,625<br />
Gifford Park Security Building Expansion $80,000 $80,000<br />
Misc. Parks Improvements Expansion $89,203 $89,203<br />
Total - Optional Sales Tax $482,160 $3,871,028 $1,090,164 $5,244,655 $720,684 $4,450,222 $15,858,913<br />
FDRAP Grant<br />
South <strong>County</strong> Park Phase II Expansion $100,000 $100,000<br />
Round Island Ocean Park Expansion $100,000 $100,000<br />
North <strong>County</strong> Park Phase II Expansion $150,000 $150,000<br />
Total - FDRAP Grant $0 $200,000 $0 $0 $150,000 $0 $350,000<br />
Park Improvement Fund<br />
North <strong>County</strong> Aquatic Center Expansion $120,611 $120,611<br />
Florida Boating Improvement Program<br />
Sebastian Canoe Launch Expansion $2,283 $82,644 $74,398 $159,325<br />
Royal Palm Pointe - City of Vero Beach Expansion $20,000 $20,000<br />
<strong>Indian</strong> <strong>River</strong> Drive Boat Dock - Sebastian Replacement $20,000 $20,000<br />
Schumann Lake Boat Ramp - Sebastian Replacement $7,800 $7,800<br />
Oslo Boat Ramp Replacement $750 $50,000 $50,750<br />
Kitching Railhead Station Expansion $146,545 $146,545<br />
Pelican Island Upland Restoration Replacement $1,000,000 $1,000,000<br />
Misc. Boating Facilities Expansion $15,000 $15,000<br />
Total - Florida Boating Improvement Program $0 $22,283 $102,644 $82,198 $750 $1,211,545 $1,419,420<br />
Total Capital Expenditures $539,060 $4,199,918 $1,306,263 $5,429,659 $1,136,312 $5,978,298 $18,589,510<br />
Total Capital Expansion Expenditures $170,522 $3,486,537 $1,084,498 $5,343,448 $1,054,499 $4,716,502 $15,856,006<br />
Percent of GF/MSTU Expenditures to Total Capital Exp. Expenditures 0.00% 0.00% 0.38% 0.45% 5.56% 2.38% 1.48%<br />
(1) Source: Office of Management and Budget, IRC<br />
Credit Calculation<br />
The credit per resident was calculated using the average capital expansion expenditures<br />
during the last six years and the future planned projects budgeted during the next fiveyears.<br />
The average annual capital expenditure amount was divided by the average<br />
residents during this eleven-year time period, resulting in an average capital expansion<br />
cost per resident of $23. This information is presented in Table X-12.<br />
Tindale-Oliver & Associates, Inc.<br />
<strong>Indian</strong> <strong>River</strong> <strong>County</strong><br />
May 2005 X-18 <strong>Impact</strong> <strong>Fee</strong> <strong>Study</strong>