San Luis Obispo - Caltrans - State of California
San Luis Obispo - Caltrans - State of California
San Luis Obispo - Caltrans - State of California
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SAN LUIS OBISPO REGION<br />
COORDINATED HUMAN SERVICES-PUBLIC TRANSPORTATION PLAN<br />
Community Meeting on Project Development<br />
<strong>San</strong> <strong>Luis</strong> <strong>Obispo</strong> City County Library, May 22 nd , 2007<br />
Reports back from three working groups that developed responses around coordination<br />
projects’. Each group’s choice covered the following topical areas:<br />
Project Development Brainstorming – Topics for Discussion<br />
Projects Value Range: $10k - $40k<br />
‣ Target population<br />
‣ Needs met - perceived benefits<br />
‣ Brief description <strong>of</strong> the program<br />
‣ Potential project partners and lead agency<br />
‣ How to measure success<br />
‣ Project timetable<br />
• Start up<br />
• Project duration<br />
Group I: Central coordinator to handle service calls.<br />
General Discussion:<br />
Target pop:<br />
• Having expanded beyond when available.<br />
Issues:<br />
• 24/7 Non-Emergency service<br />
Target pop:<br />
• People with special needs – Public transit not a good option<br />
Key issues:<br />
• Need demand response service<br />
3 elements:<br />
• 24 hr reservation and on-demand service –<br />
Volunteer Service:<br />
• Volunteer people available – core volunteers; reimbursement for immediate demand.<br />
Key issues:<br />
• Cost seems out <strong>of</strong> range for this type <strong>of</strong> service. Speaks to remote geographic cost<br />
prohibitive.<br />
• Rideshare as facilitator. Ride-On or rideshare and volunteers.<br />
• They used personal experience to estimate cost<br />
• On call jobs which work late nights<br />
• Runabout – Los Osos to airport $30.00+<br />
• Cost <strong>of</strong> parking no more than cost <strong>of</strong> public transportation (Ride-On)<br />
• Suggested group trips – were some planned but taken away.<br />
• This county has strong volunteer network RSVP, Paso Robles – recommendations that<br />
strengthen volunteer network.<br />
Comment:<br />
• Lack <strong>of</strong> information by drivers – communication and information needed<br />
• Individual trip needs can perhaps be made if we have knowledge.<br />
174<br />
OCTOBER 2007