03.03.2015 Views

California State Rail Plan 2005-06 to 2015-16

California State Rail Plan 2005-06 to 2015-16

California State Rail Plan 2005-06 to 2015-16

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter VI – Pacific Surfliner Route<br />

CHAPTER VI<br />

PACIFIC SURFLINER ROUTE<br />

SAN LUIS OBISPO-SANTA BARBARA-<br />

LOS ANGELES-SAN DIEGO<br />

PRINCIPAL <strong>2005</strong>-<strong>06</strong> <strong>to</strong> <strong>2015</strong>-<strong>16</strong> ROUTE OBJECTIVES<br />

• Improve On-Time Performance <strong>to</strong> 90% by <strong>2015</strong>-<strong>16</strong>.<br />

• Improve passenger comfort, convenience, and information with<br />

improved services on board and at stations.<br />

• Improve intermodal connectivity:<br />

o Cross-ticketing and coordinated schedules with Metrolink and Coaster.<br />

o Improved coordination with urban transit.<br />

o Improved Amtrak Thruway service.<br />

• Reduce Travel Times:<br />

o San Diego <strong>to</strong> Los Angeles - 2 hours-30 minutes (15 minute reduction).<br />

o Los Angeles <strong>to</strong> San Luis Obispo - 5 hours-5 minutes (20 minute<br />

reduction).<br />

• Increase annual ridership 40% from 2,578,000 <strong>to</strong> 3,611,000.<br />

• Increase annual revenues 60% from $28.4 million <strong>to</strong> $45.4 million for the<br />

<strong>State</strong>-supported 70% of the Route.<br />

• Increase revenue/cost (farebox) ratio from 58.0% <strong>to</strong> 65.0%.<br />

• Increase Service Frequency:<br />

o From 11 <strong>to</strong> 13 daily round-trips between San Diego – Los Angeles.<br />

o From 5 <strong>to</strong> 6 daily round-trips between Los Angeles – Santa Barbara.<br />

o From 2 <strong>to</strong> 3 daily round-trips between Santa Barbara – San Luis Obispo.<br />

• Expand Service:<br />

o San Francisco – San Luis Obispo – first daily round-trip in 2007-08,<br />

second daily round-trip in 2013-14.<br />

This Chapter presents the ten-year operational and service improvement and train<br />

service expansion plans for the Pacific Surfliner Route. The Chapter also provides<br />

information on route his<strong>to</strong>ry, route performance, route description, and route<br />

administration. Figure 6A is the Pacific Surfliner route map, including the<br />

connecting buses.<br />

67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!