California State Rail Plan 2005-06 to 2015-16
California State Rail Plan 2005-06 to 2015-16
California State Rail Plan 2005-06 to 2015-16
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>2005</strong>-<strong>06</strong> – <strong>2015</strong>-<strong>16</strong> <strong>California</strong> <strong>State</strong> <strong>Rail</strong> <strong>Plan</strong><br />
be realigned <strong>to</strong> accommodate new turnouts, signal modifications, retained<br />
embankments, and drainage facilities.<br />
Rehabilitation and Replacement Projects<br />
Bridge 230.6 Replacement Project – Significant marine borer pile damage has<br />
been detected on this 196-foot long timber trestle spanning the Agua Hedionda<br />
Lagoon in south Carlsbad, requiring its replacement.<br />
Del Mar Bluffs Stabilization-Phase 2-Preserving Track Bed Support –<br />
An alternatives analysis will be done <strong>to</strong> evaluate options <strong>to</strong> stabilize the track bed<br />
support within high-risk s<strong>to</strong>rm erosion areas including <strong>to</strong>p of bluff, <strong>to</strong>e of bluff,<br />
and bluff face stabilization.<br />
Del Mar Bluffs Stabilization-Phase 3-Additional Bluff Stabilization – Eroded<br />
track bed support will be replaced, the bluff face will be protected, and the bluff<br />
<strong>to</strong>e will be reinforced in high-risk s<strong>to</strong>rm erosion areas, as identified in the<br />
geotechnical study.<br />
Station Improvement Projects<br />
Encinitas Station Parking Lot Expansion – Additional parking facilities will be<br />
provided.<br />
Oceanside Transit Center – Landscaping and signage will be enhanced.<br />
Oceanside Transit Center Parking Structure – A new parking garage is being<br />
constructed at Oceanside Transit Center, just north of the station. The three-s<strong>to</strong>ry<br />
garage will house approximately 450 parking spaces and will be completed in<br />
April 20<strong>06</strong>.<br />
Old Town Station Platform Extension – This project will extend the station<br />
platform.<br />
Poinsettia Station Platform Extension – This project will extend both station<br />
platforms.<br />
Solana Beach Station Parking – A 500-space parking structure will be<br />
constructed as part of a mixed-use development located at the Station.<br />
108