03.03.2015 Views

California State Rail Plan 2005-06 to 2015-16

California State Rail Plan 2005-06 to 2015-16

California State Rail Plan 2005-06 to 2015-16

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>2005</strong>-<strong>06</strong> – <strong>2015</strong>-<strong>16</strong> <strong>California</strong> <strong>State</strong> <strong>Rail</strong> <strong>Plan</strong><br />

be realigned <strong>to</strong> accommodate new turnouts, signal modifications, retained<br />

embankments, and drainage facilities.<br />

Rehabilitation and Replacement Projects<br />

Bridge 230.6 Replacement Project – Significant marine borer pile damage has<br />

been detected on this 196-foot long timber trestle spanning the Agua Hedionda<br />

Lagoon in south Carlsbad, requiring its replacement.<br />

Del Mar Bluffs Stabilization-Phase 2-Preserving Track Bed Support –<br />

An alternatives analysis will be done <strong>to</strong> evaluate options <strong>to</strong> stabilize the track bed<br />

support within high-risk s<strong>to</strong>rm erosion areas including <strong>to</strong>p of bluff, <strong>to</strong>e of bluff,<br />

and bluff face stabilization.<br />

Del Mar Bluffs Stabilization-Phase 3-Additional Bluff Stabilization – Eroded<br />

track bed support will be replaced, the bluff face will be protected, and the bluff<br />

<strong>to</strong>e will be reinforced in high-risk s<strong>to</strong>rm erosion areas, as identified in the<br />

geotechnical study.<br />

Station Improvement Projects<br />

Encinitas Station Parking Lot Expansion – Additional parking facilities will be<br />

provided.<br />

Oceanside Transit Center – Landscaping and signage will be enhanced.<br />

Oceanside Transit Center Parking Structure – A new parking garage is being<br />

constructed at Oceanside Transit Center, just north of the station. The three-s<strong>to</strong>ry<br />

garage will house approximately 450 parking spaces and will be completed in<br />

April 20<strong>06</strong>.<br />

Old Town Station Platform Extension – This project will extend the station<br />

platform.<br />

Poinsettia Station Platform Extension – This project will extend both station<br />

platforms.<br />

Solana Beach Station Parking – A 500-space parking structure will be<br />

constructed as part of a mixed-use development located at the Station.<br />

108

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!