03.03.2015 Views

California State Rail Plan 2005-06 to 2015-16

California State Rail Plan 2005-06 to 2015-16

California State Rail Plan 2005-06 to 2015-16

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter XI – Amtrak<br />

Figure 11A<br />

Amtrak Five-Year Strategic <strong>Plan</strong> - Capital Projects – FFY <strong>2005</strong>-09<br />

<strong>California</strong> Projects<br />

Summary of Project Scope<br />

Amtrak<br />

Funding<br />

(000)<br />

Los Angeles Yard – New<br />

Equipment<br />

Replace electric carts and shop equipment $ 50<br />

Surfliner Equipment – Replace most parts due for renewal, along with some<br />

Overhauls<br />

upgrades and structural repairs<br />

10,600<br />

Los Angeles Yard Install roof for commissary and material control building,<br />

Improvements<br />

wheel truing machine, sand <strong>to</strong>wer and industrial waste line<br />

2,400<br />

Service & Inspection Replace specialty <strong>to</strong>ols, equipment, etc. for LA and OAK<br />

Facilities Running Repair S&I Facilities<br />

7,500<br />

Los Angeles Yard Track Construct tracks <strong>to</strong> connect <strong>to</strong> 9 th Street 250<br />

Los Angeles Union<br />

Station Improvements<br />

Oakland Maintenance<br />

Facility Phase II<br />

Oakland Maintenance<br />

Facility Yard<br />

Emeryville Station<br />

Lease/Purchase<br />

Extension of Pacific<br />

Surfliner Double-track –<br />

CP Flores <strong>to</strong> CP O’Neal<br />

San Diego – New<br />

Layover and Light<br />

Maintenance Facility<br />

Install tactile warning tiles on Tracks 10,11,12 350<br />

Construction of Commissary and Welfare facilities 14,000<br />

Demolish existing infrastructure in UP Yard 300<br />

Provide funds for lease/purchase of the station 400<br />

Construct 1.8 miles of second mainline track, including<br />

Centralized Traffic Control (CTC)<br />

Participate in the construction of a multi-s<strong>to</strong>ry building, of<br />

which the first floor is <strong>to</strong> be used by Amtrak and Caltrans <strong>to</strong><br />

s<strong>to</strong>re equipment and materials needed for rolling s<strong>to</strong>ck<br />

maintenance<br />

Construct station track, platform, and control point<br />

improvements<br />

1,250<br />

Oakland – Station and<br />

Platform Improvements<br />

680<br />

Rocklin Station Construct improvements <strong>to</strong> meet ADA Requirements 250<br />

Capi<strong>to</strong>l Corridor<br />

Install Closed Circuit Television in 8 stations along Capi<strong>to</strong>l<br />

Corridor<br />

300<br />

San Joaquin Route<br />

Install Closed Circuit Television in 8 stations along San<br />

Joaquin Route<br />

300<br />

Salinas Station Reconstruct Salinas Platform 2,525<br />

<strong>California</strong> Projects Total $ 41,505<br />

Multi-<strong>State</strong> Projects<br />

<strong>Rail</strong> Replacement and<br />

Rehabilitation – Pacific<br />

and Southwest Divisions<br />

Superliner II Equipment –<br />

Overhauls<br />

Superliner I Equipment –<br />

Overhauls<br />

F59PHI Diesel<br />

Locomotive Overhauls<br />

Western Division<br />

Pollution Prevention<br />

Replace and rehabilitate rail, wood ties, and turnouts $ 6,400<br />

Replace most parts due for renewal, along with some<br />

upgrades and structural repairs<br />

350<br />

21,200<br />

Modify or remanufacture existing equipment 13,600<br />

Replace most parts due for renewal, along with some<br />

upgrades and structural repairs<br />

5,200<br />

Construct pollution prevention upgrades and improvements 2,220<br />

Multi-<strong>State</strong> Projects Total $ 48,620<br />

GRAND TOTAL $ 90,125<br />

153

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!