California State Rail Plan 2005-06 to 2015-16
California State Rail Plan 2005-06 to 2015-16
California State Rail Plan 2005-06 to 2015-16
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter XI – Amtrak<br />
Figure 11A<br />
Amtrak Five-Year Strategic <strong>Plan</strong> - Capital Projects – FFY <strong>2005</strong>-09<br />
<strong>California</strong> Projects<br />
Summary of Project Scope<br />
Amtrak<br />
Funding<br />
(000)<br />
Los Angeles Yard – New<br />
Equipment<br />
Replace electric carts and shop equipment $ 50<br />
Surfliner Equipment – Replace most parts due for renewal, along with some<br />
Overhauls<br />
upgrades and structural repairs<br />
10,600<br />
Los Angeles Yard Install roof for commissary and material control building,<br />
Improvements<br />
wheel truing machine, sand <strong>to</strong>wer and industrial waste line<br />
2,400<br />
Service & Inspection Replace specialty <strong>to</strong>ols, equipment, etc. for LA and OAK<br />
Facilities Running Repair S&I Facilities<br />
7,500<br />
Los Angeles Yard Track Construct tracks <strong>to</strong> connect <strong>to</strong> 9 th Street 250<br />
Los Angeles Union<br />
Station Improvements<br />
Oakland Maintenance<br />
Facility Phase II<br />
Oakland Maintenance<br />
Facility Yard<br />
Emeryville Station<br />
Lease/Purchase<br />
Extension of Pacific<br />
Surfliner Double-track –<br />
CP Flores <strong>to</strong> CP O’Neal<br />
San Diego – New<br />
Layover and Light<br />
Maintenance Facility<br />
Install tactile warning tiles on Tracks 10,11,12 350<br />
Construction of Commissary and Welfare facilities 14,000<br />
Demolish existing infrastructure in UP Yard 300<br />
Provide funds for lease/purchase of the station 400<br />
Construct 1.8 miles of second mainline track, including<br />
Centralized Traffic Control (CTC)<br />
Participate in the construction of a multi-s<strong>to</strong>ry building, of<br />
which the first floor is <strong>to</strong> be used by Amtrak and Caltrans <strong>to</strong><br />
s<strong>to</strong>re equipment and materials needed for rolling s<strong>to</strong>ck<br />
maintenance<br />
Construct station track, platform, and control point<br />
improvements<br />
1,250<br />
Oakland – Station and<br />
Platform Improvements<br />
680<br />
Rocklin Station Construct improvements <strong>to</strong> meet ADA Requirements 250<br />
Capi<strong>to</strong>l Corridor<br />
Install Closed Circuit Television in 8 stations along Capi<strong>to</strong>l<br />
Corridor<br />
300<br />
San Joaquin Route<br />
Install Closed Circuit Television in 8 stations along San<br />
Joaquin Route<br />
300<br />
Salinas Station Reconstruct Salinas Platform 2,525<br />
<strong>California</strong> Projects Total $ 41,505<br />
Multi-<strong>State</strong> Projects<br />
<strong>Rail</strong> Replacement and<br />
Rehabilitation – Pacific<br />
and Southwest Divisions<br />
Superliner II Equipment –<br />
Overhauls<br />
Superliner I Equipment –<br />
Overhauls<br />
F59PHI Diesel<br />
Locomotive Overhauls<br />
Western Division<br />
Pollution Prevention<br />
Replace and rehabilitate rail, wood ties, and turnouts $ 6,400<br />
Replace most parts due for renewal, along with some<br />
upgrades and structural repairs<br />
350<br />
21,200<br />
Modify or remanufacture existing equipment 13,600<br />
Replace most parts due for renewal, along with some<br />
upgrades and structural repairs<br />
5,200<br />
Construct pollution prevention upgrades and improvements 2,220<br />
Multi-<strong>State</strong> Projects Total $ 48,620<br />
GRAND TOTAL $ 90,125<br />
153