03.03.2015 Views

California State Rail Plan 2005-06 to 2015-16

California State Rail Plan 2005-06 to 2015-16

California State Rail Plan 2005-06 to 2015-16

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>2005</strong>-<strong>06</strong> – <strong>2015</strong>-<strong>16</strong> <strong>California</strong> <strong>State</strong> <strong>Rail</strong> <strong>Plan</strong><br />

The NCRA is committed <strong>to</strong> reopening the entire line (Schellville <strong>to</strong> Eureka) <strong>to</strong> rail<br />

operations. The upgrade of the rail line would range from FRA Class 1 <strong>to</strong><br />

Class 3 standards where practical (based on cost, operational, maintenance, and<br />

environmental issues) and future long-term stabilization of the rail line through the<br />

canyon. The availability of funding is key <strong>to</strong> allowing this upgrading <strong>to</strong> go<br />

forward.<br />

2<strong>06</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!