Figure 2D<br />
Intercity <strong>Rail</strong> Rolling S<strong>to</strong>ck Overhaul Program<br />
Fiscal Year<br />
($ in millions)<br />
Projected Overhaul<br />
Funding Needs<br />
Projected Number<br />
of Units for<br />
Overhaul<br />
<strong>2005</strong>-<strong>06</strong> $ 13.8 48<br />
20<strong>06</strong>-07 $ 14.4 52<br />
2007-08 $ 13.8 66<br />
2008-09 $ 9.3 43<br />
2009-10 $ 13.2 36<br />
2010-11 $ 12.7 72<br />
2011-12 $ 13.5 53<br />
2012-13 $ 13.8 58<br />
2013-14 $ 14.1 64<br />
2014-15 $ 14.5 66<br />
<strong>2015</strong>-<strong>16</strong> $ <strong>16</strong>.5 74<br />
In addition <strong>to</strong> the mid-life overhaul and separate overhaul of specific components,<br />
the Department periodically updates or replaces specific equipment systems <strong>to</strong><br />
improve passenger amenities, safety, or function of the equipment. For example,<br />
the Department is planning <strong>to</strong> replace the outdated destination sign system on the<br />
<strong>California</strong> Car fleet with a new destination sign and au<strong>to</strong>mated passenger<br />
information system that incorporates up-<strong>to</strong>-date passenger information system<br />
technology. These new signs meet all current standards for audible and visual<br />
messaging (including ADA requirements), real-time service messages, au<strong>to</strong>mated<br />
train location and text uploading, diagnostics, and animated graphics. This system<br />
will be applied <strong>to</strong> all 78 railcars in the Northern <strong>California</strong> fleet by 20<strong>06</strong>-07.<br />
The 22 new Pacific Surfliner cars will have completed their three-year warranty<br />
period in <strong>2005</strong>. During the warranty period, the Department conducts regular<br />
inspections, documents equipment failures, evaluates defects <strong>to</strong> determine fleetwide<br />
impacts, and coordinates with Amtrak for repairs. In <strong>2005</strong>, the Department<br />
conducted a final three-year audit on the cars.<br />
After the warranty period, the cars enter in<strong>to</strong> Amtrak’s preventative maintenance<br />
program with overhauls at four, six, and eight years. The Department oversees<br />
this program.<br />