10.07.2015 Views

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 4.3-1: Culvert Inspection and MaintenanceINSPECTION AND MAINTENANCE ACTIVITIESSUGGESTEDFREQUENCYINSPECTIONEQUIPMENTMAINTENANCEEQUIPMENTInspect that the culvert properly captures and conveys runoff.• Repair any blocked or diverted conveyances.Annuallyin spring and duringmajor stormsManhole CoverHookSocket setManhole CoverHook, Socket Set,Shovel Vactor TruckInspect for and document any trash, debris, and accumulated sediment at the inlet, outlet, and in the culvert.• Remove any trash, debris, and sediment from the culvert and at the inlet and outlet.Monthly (April—Oct)Manhole CoverHookSocket setStadia rodor RulerManhole CoverHook, Socket Set,Shovel Trash Bag,Vactor TruckInspect culvert for structural integrity. This is best performed after cleaning the culvert of debris. Use ascrewdriver on metal pipes to probe for corrosion, deterioration, and durability.• Repair or replace structurally damaged culverts.• Reform crushed ends of metal culverts with a long pry bar and mark or protect ends from further damage.Annually in springManhole CoverHookSocket setScrewdriverManhole CoverHook, Socket Set,Long Pry Bar, Toolsas needed to repairor replaceInspect for erosion, undercutting, and scour, especially at the inlet and outlet and to any fill burying theculvert.• Stabilize eroded and undercut areas.• If necessary, backfill and compact supporting soil around culvert to ensure structural stability and properfunction.Annually in springand after majorstormsManhole CoverHookSocket setManhole CoverHook, Socket Set,Rock Armor, Fill DirtInspect upslope areas for contributing sediment sources to reduce the accumulation of sediment in the culvert.• Stabilize contributing eroding slopes and bare soil areas to prevent sediment entry into culvert.• Routinely sweep the street to remove sediment before it enters culvert and stormwater system.Annually in springand before majorstormsTools as needed tostabilize slopes andbare soil areas,StreetsweeperInspect site for unusual or unsafe conditions (snowplow damage, structural damage, dumping, vandalism,etc.).• Repair structural components as necessary.Annually in springManhole CoverHookSocket setTools as neededMonitor ongoing effectiveness and determine whether another <strong>BMP</strong> type or additional <strong>BMP</strong>s could improvelong-term effectiveness and improve benefits to costs versus the existing culverts.• Prepare a plan that more effectively addresses water conveyance, reduces long term maintenance costsand improves overall effectiveness and safety of the <strong>BMP</strong>.Video inspect inaccessible culverts.• Analyze video and prepare maintenance plan to restore safe/structural/unobstructed conditions.Every 5 yearsQualified Inspectoror ConsultantQualified Inspectoror ConsultantEvery 5 yearsstarting at 15 yearsoldRobotic VideoCameraTools as neededTRPA <strong>BMP</strong> Handbook Chapter 4: <strong>BMP</strong> Toolkit2012 4.3.1.1-CulvertPage 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!