TRPA Revegetation Plan ExampleSoil restoration and revegetation activities required as part of a Project’s permitted conditionsmust submit a completed TRPA Revegetation Plan:A. SITE DESCRIPTIONProject Address: ABC 123 Lane, South Lake <strong>Tahoe</strong>, El Dorado County, CAAssessor’s Parcel Number (APN): APN: 123-45-678NRCS Soil Map Unit: 7444 Max depth of Install: 24 inches Ksat (in/hr): 12.8Land Capability: 1b and 4TRPA Permit Number: <strong>BMP</strong>P0000-0000Detailed Site Description:The site comprises of an eroding slope from which runoff and sediment are transported across acompacted dirt area into SEZ. All areas are located in full sun. Existing vegetation on site ranges fromdry shrubland species on the slope, to forbes and grasses at the base of the slope, to wetland species such aswillow on the edge of and in the SEZ.B. PROJECT DESCRIPTION, GOALS AND OBJECTIVESRevegetation goals for this project are for the purpose of erosion control. The project intends to revegetateand stabilize the toe of the eroding slope, revegetate the flat compacted dirt area, and install a shallowvegetated infiltration basin upslope of the SEZ to capture and infiltrate surface water runoff originatingfrom the site before it reaches the SEZ. Revegetation and erosion control treatments are installed to thelines and grade indicated on the Plans for <strong>BMP</strong>P0000-0000, as prescribed herein, and as directed by theengineer. Without revegetation of disturbed areas, erosion and sediment transport to the SEZ willcontinue.C. PROJECT SCHEDULEDatesAugust 10-15August 15August 18August 20August 21-29August 29September 1September 1-3September 4September 5-10September 10-15September 15September 15 toActionCall before you dig 811 and contractor submittals (equipment cleanerreceipts, seed labels and planting materials orders)Install temporary <strong>BMP</strong>sPre-grade inspectionTopsoil salvage and hand removal of weeds using PulaskiGrading, soil loosening, and soil amendments48 hour notice to Engineer for plant deliveryDelivery and approval of plant and seed materialSeedingHole excavation and pre-wetting for plantingsPlant installation, native plant salvage and transplant, and soil stabilizationHand watering and install temporary irrigationWritten GuaranteeIrrigationTRPA <strong>BMP</strong> HandbookCHAPTER 5: Soil and Vegetation Management2012 TRPA Revegetation Plan ExamplePage 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!