10.07.2015 Views

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The following subjects are typically included in a biological monitoring plan:• Compilation of available data from previous projects• Baseline survey and monitoring schedule• Permanent control and reference sites - biological monitoring transects,including:• In situ quadrats for macrobenthic and invasive species monitoring• Sediment accumulation measurements• Aerial photography and mapping• Clearly stated QA/QC protocols• Adverse weather conditions and contingency plan• Deliverables and reports due8.9.4 INSTALLATIONDue to the rigorous regulatory requirements for dredging, installation requiresthe coordination of multiple agencies. In general, keep dredging to a minimumand in accordance with the required monitoring.8.9.5 MAINTENANCEDredging is a method of maintaining other shoreline structures; as such, selectsites that provide the least impact to water quality and habitat. The requiredlevel of maintenance will depend on the rate of sediment deposition as well asthe specific tolerance of the structure.CHAPTER 8: Shorezone Protective Structures and <strong>BMP</strong>sTRPA <strong>BMP</strong> Handbook8.9 Dredging 2012Page 8-64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!