10.07.2015 Views

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

during the initial site visit, or conditions are believed to be different thaninformation gathered during the pre-site visit. For example, a TRPA LandCapability and Land Coverage Verification may be required to design <strong>BMP</strong>s,and that requires an additional application and site visit from TRPA staff.2.2 PROJECTS LESS THAN 1 ACRE AND ALL SINGLE FAMILYRESIDENTIAL PROJECTS2.2.1 INITIAL DATA GATHERINGPlan Area Statements providespecific land use policies andregulations for a particulargeographic area. CommunityPlans provide historical contextand direct future land use anddevelopment within that area.All projects and activities shallbe consistent with the PlanArea Statement or CommunityPlan.2.2.1.1 LAND USEIdentify the land use on-site. Make sure the land use(s) on-site are consistentwith the applicable Plan Area Statement or Community Plan. These can all beidentified by consulting with the TRPA website at www.trpa.org under TRPARegulations.2.2.1.2 PROJECT AREA BASE MAPDevelop a simple base map which may be built upon throughout the siteanalysis and <strong>BMP</strong> design process. A map may be obtained from the CountyAssessor office or assembled by compiling record and field survey information.On the map identify if the project area is located within a scenic corridor,located within the shorezone, or located within a Steam Environment Zone(SEZ) setback. Special consideration shall be taken when planning anddesigning <strong>BMP</strong>s within these areas.2.2.1.3 PARCEL BOUNDARIESIdentify the parcel or project area boundaries and delineate it on the projectarea map. Include all easements, encroachments, setbacks, and county/cityright of ways as <strong>BMP</strong>s shall not be installed within these areas, unlesspermission is obtained from the appropriate entity. Parcel scale informationmay be obtained from the parcel deed or a site survey.2.2.1.4 TOPOGRAPHIC INFORMATIONIdentify basic topography. If a site survey has been done, use that informationto identify on-site topography and incorporate the information onto the basemap if a site survey has not been done for the project area, basic topographysuch as low spots and flow lines may be identified on-site during the initial sitevisit.2.2.1.5 NRCS SOIL SURVEYIdentify the mapped soil unit(s) within the project area. The Natural ResourcesConservation Service (NRCS) published the updated Soil Survey for the Lake<strong>Tahoe</strong> Basin (Soil Survey) in 2007. The soil survey includes characteristics ofsoil types that are needed to design <strong>BMP</strong>s. Soil map units directly correlateCHAPTER 2: Site AnalysisTRPA <strong>BMP</strong> HandbookPage 2-2 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!