10.07.2015 Views

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 8-v: Wave Setup and Run-Up for Design Wave DeterminationAdd the wave setup to the water depth at the toe of the protective measure andcalculate the height of the broken wave at the toe of the protective structure,Htb, on the basis of this combined water depth:Htbbt(Equation 16.20) dIf the water depth at the toe of the protective measure without wave setup isnegative (dt ≤ 0) – that is, if the toe of the protective measure is above the stillwater level – then the run-up wave must be considered. Linearly interpolate thewater surface elevation between the following two points:The still water shoreline, at which the wave setup is:0d b8132b(Equation 16.18)The run-up level hmax, as calculated in Section 8.16.1.3.TRPA <strong>BMP</strong> HandbookCHAPTER 8: Shorezone Protective Structures and <strong>BMP</strong>s2012 Page 8-109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!