10.07.2015 Views

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Repeat several times daily as necessary. Water application should notproduce runoff or visual signs of soil erosion.• Vacuum slurry and cuttings during concrete cutting and surfacing operationsand do not allow them to enter natural or constructed stormwaterconveyances. Pick up residue from grinding operations by means of avacuum attachment to the grinding machine. Do not allow saw cuttingresidue to flow across the pavement or be left on the surface of thepavement. Collect and place in a temporary concrete washout facility.INSPECTION AND MAINTENANCE• Review weather forecasts daily to assist in determining when dust control<strong>BMP</strong>s will be necessary.• Visually monitor effectiveness of dust control measures. If dust controlproblems are found, remedy them immediately.• Educate construction personnel to ensure that dust control measures arebeing properly implemented.Chapter 4: <strong>BMP</strong> ToolkitTRPA <strong>BMP</strong> Handbook4.5.1.7-Dust Control 2012Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!