10.07.2015 Views

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

BEsT MANAGEMENT PRACTICEs HANDbooK - Tahoe BMP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• Complaints regarding dust pollution are few when dust control <strong>BMP</strong>s arein place.Disadvantages• Certain techniques are effective for only short periods and may needfrequent daily applications to be effective.• Some techniques (e.g. wet suppression), if not applied properly, may causemore erosion than they prevent (e.g. soil loss by running water exceedssoil loss by wind).DESIGN CONSIDERATIONS• Limit soil disturbance activities on windy days.• Plan and schedule construction grading to disturb the least amount of landpossible at one time.• Establish Construction Boundary Fencing to identify the limits of soildisturbance and minimize generation of airborne dust.• Stabilize those portions of project areas where project elements have beencompleted before disturbing additional land.• Plan construction traffic access routes in the same locations as future roadswhere possible. Pave these roads when appropriate to limit the amount ofexposed soil.• Use non-potable water for wet suppression techniques when feasible.• Maintain existing vegetation as wind breaks whenever feasible, to minimizewind erosion of soils.• Give special attention to dust control in windy or wind-prone areas, such asridgetops or near canopy openings caused by public roads.INSTALLATIONInstall appropriately-identified dust control <strong>BMP</strong>s at the onset of constructionand inspect them periodically throughout the project duration. Stabilizeexposed soil by converting to permanent <strong>BMP</strong>s as soon as practical.Use one or more of the following methods to control dust:• Install temporary/permanent vegetation and organic mulch. Ensureapplication is in accordance with fire defensible space specifications asoutlined in Living with Fire: A Guide for the Homeowner, Lake <strong>Tahoe</strong> BasinEdition and Chapter 5 Soil and Vegetation Management, Section 5.3.2.5 FireDefensible Space.• Lightly mulch (less than 1 inch thickness) or blanket exposed soil in aproject area that will be left for a short period, but disturbed again at alater date.Chapter 4: <strong>BMP</strong> ToolkitTRPA <strong>BMP</strong> Handbook4.5.1.7-Dust Control 2012Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!