12.07.2015 Views

DocAve 6 Service Pack 3 Control Panel Reference Guide - AvePoint

DocAve 6 Service Pack 3 Control Panel Reference Guide - AvePoint

DocAve 6 Service Pack 3 Control Panel Reference Guide - AvePoint

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

the logical device configuration and go back to the Data Selection interface orclick Cancel to exit the interface.*Note: In Recycle Bin, the <strong>DocAve</strong> 5 stubs in the deleted lists/libraries level or the abovelevel will not be upgraded to the <strong>DocAve</strong> 6 stubs.• Logical Device – After you have configured the logical device, this column will show theStorage Manager logical device that you have configured.• Last Imported Time – If you checked the previously converted data in farm, Webapplication or content database, you can view the last imported time of the data in thiscolumn. If you want to import the data you imported before, you can select the samedata level, and after the job finished, the last imported time will change to the latesttime.After you finish the configuration, click Next to go to the next step.3. Data Settings – Set up the following configurations:• Storage Manager Settings – In this field, you can set up Compression and Encryption forStorage Manager.ooData Compression – This option allows you to compress BLOB data and savespace. Select the Compression option and select a compression level. A lowcompression level results in a faster compression rate but a larger data set,while a high compression level results in a slower compression rate but asmaller, better quality data set. Note that small data sets occupy more systemresources and cause slower job times. The compression is performed on theSharePoint Server (SharePoint Agent).Data Encryption – If you want to enable data encryption, check Encryption andselect a security profile in the Security Profile drop-down list. You can also clickNew Security Profile to create a new security profile. Encryption protectssensitive materials; however, note that encrypting data causes slower extendtimes. The encryption is performed on the SharePoint Server (SharePointAgent).• Agent Group – If you have several agent groups under one farm, you can select an agentgroup to run the data importing job.• Notification – Specify a notification profile to send out an e-mail notification report tospecified <strong>DocAve</strong> users. You can select previously configured notification profile in thedrop-down list or click New Notification Profile to create a new notification profile. Fordetails on how to configure a notification setting, refer to the User Notification Settingssection in this user guide.• Schedule Selection – Set up a schedule to run the converting data job. If you want torun the job right now, select Import once finish the wizard. If you want to set up aschedule, select Configure the schedule myself to have <strong>DocAve</strong> run the converting jobat a designated time. You can specify the start time for the job by selecting a time fromthe drop-down list for date and entering hour and minute in the other two text boxes.<strong>DocAve</strong> 6: <strong>Control</strong> <strong>Panel</strong>131

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!