12.07.2015 Views

DocAve 6 Service Pack 3 Control Panel Reference Guide - AvePoint

DocAve 6 Service Pack 3 Control Panel Reference Guide - AvePoint

DocAve 6 Service Pack 3 Control Panel Reference Guide - AvePoint

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

After you are satisfied with the settings, click Next on the ribbon or the Nextbutton to go to the next step.4. Advanced – Configure advanced settings for the plan group:• How would you like to run the plans in the group? – Choose a group type to specifyhow to run the plans in the plan group. Select Sequential or Parallel as the group type ofthe plan group.ooSequential – Runs the plans one by one according to their order in the plangroup.Parallel – Runs the plans in one plan group simultaneously according to theirorder in the plan group and the specified Concurrent Plans count.• What jobs should influence the outcome of the plan group? – This field is availablewhen you select Sequential as the group type in the How would you like to run theplans in the group field. Select the Skip the subsequent jobs when the jobs with thefollowing statuses appear checkbox, and then select Failed, Paused, Skipped, Stopped,or Finished with Exception by selecting the corresponding checkboxes from the dropdownlist. When jobs in this plan group complete with the selected statuses appear, thefollowing plans in this group will be skipped.• How many plans would you like to run simultaneously? – This field is available whenyou select Parallel as the group type in the How would you like to run the plans in thegroup field. Specify the number of the concurrent plans by entering a positive integer inthe Plan count text box. The default concurrent plan number is 5, which means as manyas 5 plans can be run simultaneously; all of the other plans with the order larger than 5will wait until any of the 5 former plans is completed, and then the plan with the smallerorder will be run first. When using this group type, the status of jobs in the plan groupwill not affect the execution of each other.*Note: For File System Migration, <strong>DocAve</strong> recommends you run at most 7 planssimultaneously to maximize efficiency.5. Click Next on the ribbon or the Next button to go to the next step.6. Schedule – Configure the schedule settings for the plan group by choosing one of the followingoptions:• Schedule – Configure the schedule settings for the plan group by choosing one of thefollowing options:ooNo schedule – Do not configure a schedule for the plan group.Configure the schedule myself – Customize schedules for the plan group in theSchedule Settings field. To preview the added schedules, click Calendar View toview them by Day, by Week, or by Month in a pop-up calendar. To configure anew schedule for the plan group, click Add Schedule and refer to Configuringthe Add Schedule Interface section for more information.168<strong>DocAve</strong> 6: <strong>Control</strong> <strong>Panel</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!