12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 157.) SOIL EROSION CONTROLDescription157.01 This work consists of furnishing, constructing, and maintaining permanentand temporary erosion and sediment control measures.Material157.02 Conform to the following Subsections:Backfill material 704.03Bales 713.13Erosion control culvert pipe 713.15Fertilizer 713.03Geotextile 714.01Matting 629.02Mulch 713.05Plastic lining 725.19Riprap 251.02Sandbags 713.14Seed 713.04Silt fence 713.16Water 725.01Construction Requirements157.03 General. Provide permanent and temporary erosion control measuresto minimize erosion and sedimentation during and after construction accordingto the contract erosion control plan, contract permits, Section 107, and thisSection. Contract permits amend the requirements of this Section. Do notmodify the type, size, or location of any control or practice without approval.The contract erosion control plan reflects special concerns and measures toprotect resources. An alternate erosion control proposal, with all necessarypermits, may be submitted for approval according to Subsection 104.03. Submitalternate erosion control proposals at least 30 days before their intendeduse.88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!