12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 552the project curing facility. Two of the 4 cylinders will be used for 28-daycompressive strength tests. The remaining cylinders will be used forverification, projected strengths, or other purposes specified. Assist inthe performing of other tests as requested.552.10 Temperature and Weather Conditions. Maintain the temperatureof the concrete mixture just before placement between 50 and 90 bF, exceptmaintain the concrete for bridge decks between 50 and 80 bF.(a) Cold weather. Cold weather is defined as any time during the concreteplacement or curing period the ambient temperature at the work site dropsbelow 35 bF or the ambient temperature at the site drops below 50 bFfor a period of 12 hours or more.When cold weather is reasonably expected or has occurred within 7 days ofanticipated concrete placement, submit a detailed plan for the producing,transporting, placing, protecting, curing, and temperature monitoring ofconcrete during cold weather. Include procedures for accommodating abruptchanges in weather conditions. Do not commence placement until plan isaccepted. Acceptance of a plan will take at least 1 day.Have all material and equipment required for protection available at or nearthe project before commencing cold weather concreting.Remove all snow, ice, and frost from the surfaces, including reinforcementand subgrade, against which the concrete is to be placed. The temperatureof any surface that will come into contact with fresh concrete shall be at least35 bF and shall be maintained at a temperature of 35 bF or above during theplacement of the concrete.Place heaters and direct ducts so as not to cause concrete drying or firehazards. Vent exhaust flue gases from combustion heating units to the outsideof any enclosures. Heat the concrete components in a manner that is notdetrimental to the mix. Do not heat cement or permit the cement to comeinto contact with aggregates that are hotter than 100 bF. Concrete at the timeof placement shall be of uniform temperature and free of frost lumps. Donot heat aggregates with a direct flame or on sheet metal over fire. Do notheat fine aggregate by direct steam. The addition of salts to prevent freezingis not permitted.381

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!