12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 619Provide a concrete footing for the drop-bar locking device on doublemetal gates. Make a hole to receive the locking bar to the depth specifiedby the manufacturer of the locking device.Hinge each single gate to prevent removal of the gate without tools. Setthe gate in an approximately horizontal plane. Set the gate so it swingsfreely inward and outward and fastens securely in its latch holder, or inthe case of double gates, in its latch holder and gate stops. Set doublegates on their respective hinge pintles to provide a common horizontalplane in which each single gate swings. Set gates to swing open at least90 degrees in each direction.(c) Wire fences and gates.(1) Posts. Excavate holes for posts, footings, and anchors as shown.Space posts at intervals shown for the type of fence being installed. Measurepost spacing interval parallel to the existing ground slope. Set postsin a vertical position. Backfill post holes in 6-inch lifts. Tamp and compacteach lift.Wood posts may be driven in place if the method of driving does notdamage the post. Metal posts may be driven. Set metal corner, gate, end,and pull posts in concrete.Where solid rock is encountered without overburden, drill line post holesat least 14 inches deep and end, corner, gate, and pull posts at least 20inches deep in the solid rock. Make the hole width or diameter at least1 inch greater than the post width or diameter. Cut the post to the requiredlength before installation or drill the hole deep enough to set thepost at the required height. Set and plumb the post and fill the hole withgrout. Thoroughly work the grout into the hole to eliminate voids.Crown the grout to drain water away from the post. Metal posts set inthis manner do not require anchor plates and concrete footings.Where solid rock is covered with soil or loose rock overburden, set poststo the plan depth or to the minimum depth into the solid rock as specifiedabove, whichever is less. When the depth of overburden is greater than12 inches, use an anchor plate on steel line posts and backfill steel end,corner, gate, and pull posts with concrete from the solid rock to top of theground. When the depth of overburden is589

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!