Section 605Measurement605.08 Measure underdrain systems, standard underdrain systems, geocompositeunderdrain systems, and pavement edge drain systems by the linearfoot. When measurement is for a system, do not measure geotextiles, collectorpipes, backfill, and outlet pipes that are part of the system unless a pay item isshown in the contract.Measure sheet drain systems by the square foot of front face in final positionexcluding overlaps.Measure collector pipe and outlet pipe by the linear foot.Measure granular backfill and sand by the cubic yard in place.Payment605.09 The accepted quantities, measured as provided above, will be paid atthe contract price per unit of measurement for the pay items listed below thatare shown in the bid schedule. Payment will be full compensation for thework prescribed in this Section. See Subsection 109.05.Payment will be made under:Pay ItemPay Unit60501 Underdrain system Linear foot60502 Standard underdrain system Linear foot60503 Geocomposite underdrain system Linear foot60504 Geocomposite pavement edge drain system Linear foot60505 Geocomposite sheet drain system Square foot60506 ___ inch collector pipe Linear foot60507 ___ inch outlet pipe Linear foot60508 Granular backfill Cubic yard60509 Sand Cubic yard539

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!