Section 153(d) Provide training as necessary.(e) Establish detailed testing schedule based on the productionschedule.(3) Production phase.(a) Conduct intermittent or continuous inspection during constructionto identify and correct deficiencies.(b) Inspect completed phases before scheduled Governmentacceptance.(c) Provide feedback and system changes to prevent repeateddeficiencies.(c) Description of records. List the records to be maintained.(d) Personnel qualifications.(1) Document the name, authority, relevant experience, and qualificationsof person with overall responsibility for the inspection system.(2) Document the names, authority, and relevant experience of all personneldirectly responsible for inspection and testing.(e) Subcontractors. Include the work of all subcontractors. If a subcontractoris to perform work under this Section, detail how that subcontractorwill interface with the Contractor's and/or other subcontractor's organizations.Modifications or additions may be required to any part of the plan that is notadequately covered. Acceptance of the quality control plan will be based onthe inclusion of the required information. Acceptance does not imply anywarranty by the Government that the plan will result in consistent contractcompliance. It remains the responsibility of the Contractor to demonstratesuch compliance.Do not begin the work until the quality control plan covering that work isaccepted.Supplement the plan as work progresses and whenever quality control orquality control personnel changes are made.74

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!