12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 636Measure relocations by the each. Do not measure additional line or connectionsnecessary, to place the fixture at the new location.Payment636.13 The accepted quantities, measured as provided above, will be paid atthe contract price per unit of measurement for the pay items listed below thatare shown in the bid schedule. Payment will be full compensation for thework prescribed in this Section. See Subsection 109.05.Lump sum items will be paid as follows:(a) 75 percent of the lump sum will be paid as the work progresses based ona certified cost breakdown.(b) Payment of the remaining 25 percent will be made upon successfulcompletion of the demonstration period.Payment will be made under:Pay ItemPay Unit63601 Signal installation Lump sum63602 Lighting installation Lump sum63603 Electrical installation Lump sum63604 Railroad crossing system Lump sum63605 Relocate (description) Lump sum63606 Conduit, ___ inch, (description) Linear foot63607 Electrical conductors (description) Linear foot63608 Luminaires (description) Each63609 Poles (description) Each63610 Pull box Each63611 Relocate (description) Each656

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!