Section 401Payment401.19 The accepted quantities, measured as provided above, will be paid atthe contract price per unit of measurement for the pay items listed below thatare shown in the bid schedule except the hot asphalt concrete pavement contractunit bid price will be adjusted according to Subsection 106.05. Paymentwill be full compensation for the work prescribed in this Section. See Subsection109.05.Payment for hot asphalt concrete pavement will be made at a price determinedby multiplying the contract unit bid price by the material pay factor. Thematerial pay factor is the lowest single pay factor determined for asphalt content,specific gravity (density), or any individual sieve of the aggregategradation.When the bid schedule contains a pay item for hot asphalt concrete pavementtype I, II, or III pavement smoothness, a separate adjustment will be made forpavement smoothness according to the following formula:A = 20,000(PF - 1.00)(L)Where:A = Adjustment to contract payment in dollars for pavementsmoothness.L = Total project length in lane miles of traveled way. Measureproject length to 3 decimal places.PF = Pay factor for smoothness with respect to the upperspecification limit determined according to Subsection106.05 after completion of corrective work.248

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!