12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 101Density ) Mass per unit volume of material. Specific gravity multiplied by theunit mass of water.Drawings ) Design sheets or fabrication, erection, or construction detailssubmitted to the Government by the Contractor according to FAR Clause52.236-21, Specifications and Drawings for Construction.Falsework ) Any temporary construction work used to support the permanentstructure until it becomes self-supporting. Falsework includes steel or timberbeams, girders, columns, piles, foundations, and any proprietary equipmentincluding modular shoring frames, post shores, and adjustable horizontalshoring.Forms ) Temporary structures or molds used to retain plastic or fluid concretein its designated shape until it hardens. Forms shall have enough strength toresist the fluid pressure exerted by plastic concrete and all additional fluidpressure effects generated by vibration.Government ) The Government of the United States of America.<strong>Highway</strong>, Street, or Road ) A general term denoting a public way for purposesof vehicular travel, including the entire area within the right-of-way.Layer ) See "lift."Lift ) When placing and compacting soils and aggregates, a lift is any single,continuous layer of material which receives, during a single work operation,the same compactive effort throughout. When installing culvert pipe less thanor equal to 48 inches in diameter, the backfill material placed on both sides ofthe pipe is considered to be contained in the same lift when the material isplaced to the same elevation on both sides of the culvert, the compactive effortapplied to one side of the culvert is the same as that applied to the other, andthe compactive effort is applied to both sides of the pipe in a continuousoperation.Material ) Any substances specified or necessary to satisfactorily completethe contract work.9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!