Attention! Your ePaper is waiting for publication!
By publishing your document, the content will be optimally indexed by Google via AI and sorted into the right category for over 500 million ePaper readers on YUMPU.
This will ensure high visibility and many readers!
Your ePaper is now published and live on YUMPU!
You can find your publication here:
Share your interactive ePaper on all platforms and on your website with our embed function
FP-96 English Version - Eastern Federal Lands Highway Division
FP-96 English Version - Eastern Federal Lands Highway Division
FP-96 English Version - Eastern Federal Lands Highway Division
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DIVISION 300Aggregate Courses191
DIVISION 300Aggregate Courses191
- Page 1 and 2:
FederalLands Highways"Commitment to
- Page 3 and 4:
PREFACEThese Standard Specification
- Page 5 and 6:
TABLE OF CONTENTSPageDIVISION 100 G
- Page 7 and 8:
PageDIVISION 150 PROJECT REQUIREMEN
- Page 9 and 10:
PageDIVISION 550 BRIDGE CONSTRUCTIO
- Page 11 and 12:
PageSection 703 (continued)703.06 C
- Page 13 and 14:
PageSection 710 (continued)710.08 S
- Page 15 and 16:
PageSection 718 TRAFFIC SIGNING AND
- Page 17:
DIVISION 100General Requirements
- Page 20:
Section 101101.03 Abbreviations. Wh
- Page 23 and 24:
Section 101101.04 Definitions. FAR
- Page 25 and 26:
Section 101Density ) Mass per unit
- Page 27 and 28:
Section 101Roadside ) All area with
- Page 29 and 30:
Section 101Supplemental Specificati
- Page 31 and 32:
Section 102Insert a unit bid price,
- Page 33 and 34:
Section 102The requirements contain
- Page 35 and 36:
Section 103Acceptance of this partn
- Page 37 and 38:
Section 104(b) Specific requirement
- Page 39 and 40:
Section 105(b) Government-listed so
- Page 41 and 42:
Section 106.) ACCEPTANCE OF WORK106
- Page 43 and 44:
Section 106(2) Test results on mate
- Page 45 and 46:
Section 106If the sampling frequenc
- Page 47 and 48:
(3) Calculate the upper quality ind
- Page 49 and 50:
Section 106When public traffic is a
- Page 51 and 52:
Section 106Table 106-1 (continued)E
- Page 53 and 54:
Table 106-2 Pay Factors (continued)
- Page 55 and 56:
Section 107Before beginning work in
- Page 57 and 58:
Section 107Flaggers are also furnis
- Page 59 and 60:
Section 107Admit any OSHA inspector
- Page 61 and 62:
Section 108.) PROSECUTION AND PROGR
- Page 63 and 64:
Section 108Liquidated damages will
- Page 65 and 66:
Section 109.) MEASUREMENT AND PAYME
- Page 67 and 68:
51Section 109When asphalt material
- Page 69 and 70:
53Section 109Attach an automatic pr
- Page 71 and 72:
55Section 109(2) The Measurement Su
- Page 73 and 74:
57Section 109(1) Direct costs.(a) M
- Page 75 and 76:
59Section 109The closing date for p
- Page 77:
61Section 109If unresolved claims e
- Page 80 and 81:
Section 151.) MOBILIZATIONDescripti
- Page 82 and 83:
Section 152.) CONSTRUCTIONSURVEY AN
- Page 84 and 85:
Section 152(c) Slope stakes and ref
- Page 86 and 87:
Section 152(m) Intermediate surveyi
- Page 88 and 89:
Section 152Payment152.06 The accept
- Page 90 and 91:
Section 153(d) Provide training as
- Page 92 and 93:
Section 153153.05 Acceptance. The C
- Page 94 and 95:
Section 154Measurement154.06 Measur
- Page 96 and 97:
Section 155Show completion of the w
- Page 98 and 99:
Section 155(d) Describe planned pro
- Page 100 and 101:
Section 156.) PUBLIC TRAFFICDescrip
- Page 102 and 103:
Section 156(h) Provide two-way radi
- Page 104 and 105:
Section 157.) SOIL EROSION CONTROLD
- Page 106 and 107:
Section 157157.05 Filter Barriers.
- Page 108 and 109:
Section 157157.12 Inspection and Re
- Page 110 and 111:
Section 157Progress payments for er
- Page 112 and 113:
Section 158Payment158.06 The accept
- Page 114 and 115:
Section 201.) CLEARING AND GRUBBING
- Page 116 and 117:
Section 201Payment201.09 The accept
- Page 118 and 119:
Section 202202.06 Special Clearing
- Page 120 and 121:
Section 203Where part of an existin
- Page 122 and 123:
Section 204.) EXCAVATION AND EMBANK
- Page 124 and 125:
Section 204204.06 Roadway Excavatio
- Page 126 and 127:
Section 204During all stages of con
- Page 128 and 129:
Section 204Operate compression-type
- Page 130 and 131:
Section 204Clearing will be evaluat
- Page 132 and 133:
Section 204(2) Do not include the f
- Page 134 and 135:
Table 204-1Sampling and TestingSect
- Page 136 and 137:
Section 205.) ROCK BLASTINGDescript
- Page 138 and 139:
Section 205When a test blast is det
- Page 140 and 141:
Section 205Halt blasting operations
- Page 142 and 143:
Section 207.) EARTHWORK GEOTEXTILES
- Page 144 and 145:
Section 207the contract price per u
- Page 146 and 147:
Section 208Remove safety features w
- Page 148 and 149:
Section 208(d) Unstable material be
- Page 150 and 151:
Section 208Payment208.14 The accept
- Page 152 and 153:
Section 209.) STRUCTURE EXCAVATIONA
- Page 154 and 155:
Section 209209.10 Backfill. Backfil
- Page 156 and 157: Section 209Measurement and Payment2
- Page 158 and 159: Section 210.) PERMEABLE BACKFILLDes
- Page 160 and 161: Section 210Table 210-1Sampling and
- Page 162 and 163: Section 211Measurement211.07 Measur
- Page 164 and 165: Section 212212.05 Acceptance. Linea
- Page 166 and 167: Section 213Include the following wi
- Page 168 and 169: Section 213If the subgrade loses st
- Page 170 and 171: Section 213Material orProductProper
- Page 172 and 173: Section 251.) RIPRAPDescription251.
- Page 174 and 175: Section 251Payment will be made und
- Page 176 and 177: Section 252.) SPECIAL ROCK EMBANKME
- Page 178 and 179: Section 253.) GABIONS AND REVET MAT
- Page 180 and 181: Section 253Survey work will be eval
- Page 182 and 183: Section 254(c) Timber crib wall. Co
- Page 184 and 185: Section 255.) MECHANICALLYSTABILIZE
- Page 186 and 187: Section 255Do not damage or disturb
- Page 188 and 189: Section 256.) PERMANENT GROUND ANCH
- Page 190 and 191: Section 256Locate the upper central
- Page 192 and 193: Section 256Insert the tendon in the
- Page 194 and 195: Section 256(3) A calibrated referen
- Page 196 and 197: Section 256Plot the ground anchor m
- Page 198 and 199: Section 257.) ALTERNATE RETAINING W
- Page 200 and 201: Section 257(b) Dimensions and sched
- Page 202 and 203: Section 257Payment257.08 The accept
- Page 204 and 205: Section 258258.06 Backfilling. Back
- Page 208 and 209: Section 301.) UNTREATED AGGREGATE C
- Page 210 and 211: Section 301Construction of untreate
- Page 212 and 213: Section 301Material orProductProper
- Page 214 and 215: Section 302Table 302-1Range of Aggr
- Page 216 and 217: Section 302If the time between plac
- Page 218 and 219: Section 302Payment will be made und
- Page 220 and 221: Section 303.) ROAD RECONDITIONINGDe
- Page 222 and 223: Section 303(c) Asphalt surfaces. Cl
- Page 224 and 225: Section 304.) AGGREGATE STABILIZATI
- Page 226 and 227: Section 304304.07 Curing. Do not al
- Page 228 and 229: Section 304Table 304-1Sampling and
- Page 230 and 231: Section 305305.05 Acceptance. Aggre
- Page 232 and 233: Section 306.) DUST PALLIATIVEDescri
- Page 234 and 235: Section 306Payment306.07 The accept
- Page 236 and 237: Section 307Construct stockpile laye
- Page 238 and 239: Section 308.) MINOR CRUSHED AGGREGA
- Page 240 and 241: Section 308Payment308.08 The accept
- Page 242 and 243: Section 309. — EMULSIFIED ASPHALT
- Page 244 and 245: Section 309Construction of emulsifi
- Page 247 and 248: DIVISION 400Asphalt PavementsandSur
- Page 249 and 250: Section 401Furnish mixes as follows
- Page 251 and 252: Section 401Table 401-3Superpave Asp
- Page 253 and 254: Section 401Submit written job-mix f
- Page 255 and 256: Section 401401.04 Mixing Plant. Use
- Page 257 and 258:
Section 401401.06 Surface Preparati
- Page 259 and 260:
Section 401Construct the control st
- Page 261 and 262:
Section 401Along forms, curbs, head
- Page 263 and 264:
Section 401401.17 Acceptance. Miner
- Page 265 and 266:
Section 401Payment will be made und
- Page 267 and 268:
Section 402.) MINOR HOT ASPHALT CON
- Page 269 and 270:
Table 402-1Sampling and Testing253M
- Page 271 and 272:
Section 403Where it is necessary to
- Page 273 and 274:
Section 403(c) Density. The lower s
- Page 275 and 276:
Material orProductProperty orCharac
- Page 277 and 278:
Section 404404.06 Weather Limitatio
- Page 279 and 280:
Material orProductProperty orCharac
- Page 281 and 282:
Section 405405.05 Construction. Pre
- Page 283 and 284:
Material orProductProperty orCharac
- Page 285 and 286:
Section 406(b) Emulsified asphalt.(
- Page 287 and 288:
Section 406(c) Add the following to
- Page 289 and 290:
Material orProductProperty orCharac
- Page 291 and 292:
Section 407Table 407-1Open-Graded E
- Page 293 and 294:
Section 407Make a minimum of 3 comp
- Page 295 and 296:
Section 407Payment407.14 The accept
- Page 297 and 298:
Section 408.) COLD RECYCLEDASPHALT
- Page 299 and 300:
Section 408The final emulsified asp
- Page 301 and 302:
Material orProductProperty orCharac
- Page 303 and 304:
Section 409(d) Asphalt temperature.
- Page 305 and 306:
Section 409The CO will approve the
- Page 307 and 308:
Table 409-2Approximate Quantities o
- Page 309 and 310:
Section 409409.13 Acceptance. Aspha
- Page 311 and 312:
Section 410.) SLURRY SEALDescriptio
- Page 313 and 314:
Section 410(3) Adjustable to assure
- Page 315 and 316:
Material orProductProperty orCharac
- Page 317 and 318:
Section 411Cure surfaces primed wit
- Page 319 and 320:
Section 412.) ASPHALT TACK COATDesc
- Page 321 and 322:
Section 413.) ASPHALT PAVEMENT MILL
- Page 323 and 324:
Section 414.) ASPHALT PAVEMENTCRACK
- Page 325 and 326:
Section 414Seal the joints with an
- Page 327 and 328:
Section 415.) PAVING GEOTEXTILESDes
- Page 329 and 330:
Section 415Measurement415.08 Measur
- Page 331 and 332:
Section 416(b) Specialty qualificat
- Page 333 and 334:
Section 416Place, spread, and strik
- Page 335 and 336:
Section 416Measurement416.11 Measur
- Page 337 and 338:
Section 417.) MINOR COLD ASPHALT MI
- Page 339 and 340:
DIVISION 500Portland CementConcrete
- Page 341 and 342:
Water/CementRatio(maximum)Table 501
- Page 343 and 344:
Section 501501.05 Preparing Roadbed
- Page 345 and 346:
Section 501(2) Sawed joints. After
- Page 347 and 348:
Section 501501.10 Curing. Immediate
- Page 349 and 350:
Section 501(c) Defective area corre
- Page 351 and 352:
Section 501Place dowels or tie bars
- Page 353 and 354:
Section 501Measurement501.16 Measur
- Page 355 and 356:
Material orProductProperty orCharac
- Page 357 and 358:
Section 502(c) Sandblasting. Furnis
- Page 359 and 360:
Section 502(b) Patch area preparati
- Page 361 and 362:
Section 502502.07 Pavement Jacking.
- Page 363 and 364:
Section 502(c) Cleaning holes. Afte
- Page 365 and 366:
Section 502Seating consists of roll
- Page 367 and 368:
Section 502Measure surface diamond
- Page 369 and 370:
DIVISION 550Bridge Construction353
- Page 371 and 372:
Section 551(2) Open-end diesel hamm
- Page 373 and 374:
Section 551(c) Capblock (hammer cus
- Page 375 and 376:
Section 551(2) Pile drive head. Pro
- Page 377 and 378:
Section 551(b) Dynamic formula. Dri
- Page 379 and 380:
Section 551Correct all piles driven
- Page 381 and 382:
Section 551(c) Concrete pile extens
- Page 383 and 384:
Section 551Perform additional wave
- Page 385 and 386:
Section 551(b) Wood piles. Treat th
- Page 387 and 388:
Section 551Measure preboring by the
- Page 389 and 390:
Section 552Table 552-1Composition o
- Page 391 and 392:
Section 552(j) Water content (inclu
- Page 393 and 394:
Section 552(a) Central-mix plant. D
- Page 395 and 396:
Section 552552.09 Quality Control o
- Page 397 and 398:
Section 552the project curing facil
- Page 399 and 400:
Section 552(c) Evaporation. When pl
- Page 401 and 402:
Section 552Do not place concrete un
- Page 403 and 404:
Section 552Do not drop unconfined c
- Page 405 and 406:
Section 552Place underwater concret
- Page 407 and 408:
Section 552552.14 Finishing Plastic
- Page 409 and 410:
Section 552On bridge decks, discont
- Page 411 and 412:
Section 552Keep surfaces to be rubb
- Page 413 and 414:
Section 552Rub or grind bearing sur
- Page 415 and 416:
Section 552Use paper, cloth, or oth
- Page 417 and 418:
Section 552finished bents piers, or
- Page 419 and 420:
Material orProductProperty orCharac
- Page 421 and 422:
Section 553For on-site casting, sub
- Page 423 and 424:
Section 553Cure precast, prestresse
- Page 425 and 426:
Section 553Within 3 hours before pl
- Page 427 and 428:
Section 553Before placing concrete,
- Page 429 and 430:
Section 553Provide standby flushing
- Page 431 and 432:
Section 553Table 553-1 (continued)P
- Page 433 and 434:
Section 553Concrete for precast, pr
- Page 435 and 436:
Material orProductProperty orCharac
- Page 437 and 438:
Section 554Do not use reinforcing s
- Page 439 and 440:
Section 554Table 554-1Reinforcing S
- Page 441 and 442:
Section 555.) STEEL STRUCTURESDescr
- Page 443 and 444:
Section 555Where specific orientati
- Page 445 and 446:
Section 555For other steels (except
- Page 447 and 448:
Section 555(e) Stiffeners and conne
- Page 449 and 450:
Section 555Table 555-4ANSI Surface
- Page 451 and 452:
Section 555Stress relieve members (
- Page 453 and 454:
Section 555When reaming or drilling
- Page 455 and 456:
Section 555Use methods and details
- Page 457 and 458:
Section 555555.17 Connections Using
- Page 459 and 460:
Bolt LengthMeasured fromUnderside o
- Page 461 and 462:
Section 555(b) Use hardened washers
- Page 463 and 464:
Section 555Perform the calibration
- Page 465 and 466:
Section 555Individually place 3 bol
- Page 467 and 468:
Section 555Install more cylindrical
- Page 469 and 470:
Section 556.) BRIDGE RAILINGDescrip
- Page 471 and 472:
Section 556(d) Welding. Weld accord
- Page 473 and 474:
Section 557.) TIMBER STRUCTURESDesc
- Page 475 and 476:
Section 557557.08 Countersinking. C
- Page 477 and 478:
Section 557557.15 Transversely Nail
- Page 479 and 480:
Section 558.) DAMPPROOFINGDescripti
- Page 481 and 482:
Section 559.) WATERPROOFINGDescript
- Page 483 and 484:
Section 559Completely cover the mem
- Page 485 and 486:
Section 560.) WATER STOPSDescriptio
- Page 487 and 488:
Section 561.) STRUCTURAL CONCRETE B
- Page 489 and 490:
Section 561561.05 Coring. Take one
- Page 491 and 492:
Table 561-1Sampling and Testing475M
- Page 493 and 494:
Section 562(e) Provide design calcu
- Page 495 and 496:
Table 562-1Design Wind Pressure - H
- Page 497 and 498:
Section 562(1) Reductions in allowa
- Page 499 and 500:
Section 562When a pile-type foundat
- Page 501 and 502:
Section 562562.08 Falsework for Ste
- Page 503 and 504:
Section 562Do not use form ties con
- Page 505 and 506:
Section 562(c) Metal forms. The spe
- Page 507 and 508:
Section 562562.12 Acceptance. Forms
- Page 509 and 510:
Section 563(a) Manufacturer's mater
- Page 511 and 512:
Section 563Cure each coat of paint
- Page 513 and 514:
Section 563COATPrimerIntermediateTo
- Page 515 and 516:
Section 563SubstrateTable 563-3Coat
- Page 517 and 518:
Section 563Payment563.13 The accept
- Page 519 and 520:
Section 564Package bearings so they
- Page 521 and 522:
Section 564564.06 Masonry, Sole, an
- Page 523 and 524:
Section 564Bearing device installat
- Page 525 and 526:
Section 565(f) Details of reinforce
- Page 527 and 528:
Section 565(a) Less than 12 inches
- Page 529 and 530:
Section 565Furnish reports of all t
- Page 531 and 532:
Section 565During concrete placemen
- Page 533 and 534:
Section 565Place the concrete in a
- Page 535 and 536:
DIVISION 600Incidental Construction
- Page 537 and 538:
Section 601TABLE 601-1Composition o
- Page 539 and 540:
Section 601Payment will be made und
- Page 541 and 542:
Section 602Construction Requirement
- Page 543 and 544:
Section 602Payment602.10 The accept
- Page 545 and 546:
Section 603Torque steel bolts and a
- Page 547 and 548:
Section 604.) MANHOLES, INLETS,AND
- Page 549 and 550:
Section 604When catch basins and in
- Page 551 and 552:
Section 605.) UNDERDRAINS, SHEET DR
- Page 553 and 554:
Section 605Fold the geotextile over
- Page 555 and 556:
Section 605Measurement605.08 Measur
- Page 557 and 558:
Section 606.) CORRUGATED METAL SPIL
- Page 559 and 560:
Section 607.) CLEANING, RECONDITION
- Page 561 and 562:
Section 608.) PAVED WATERWAYSDescri
- Page 563 and 564:
Section 608608.09 Placed Riprap Wat
- Page 565 and 566:
Material orProductProperty orCharac
- Page 567 and 568:
Section 609Make the curb joint 0.75
- Page 569 and 570:
Section 609Measurement609.10 Measur
- Page 571 and 572:
Section 610.) HORIZONTAL DRAINSDesc
- Page 573 and 574:
Section 611.) WATER SYSTEMSDescript
- Page 575 and 576:
Section 611Payment611.09 The accept
- Page 577 and 578:
Section 612Where premolded watertig
- Page 579 and 580:
Section 613.— SIMULATED STONEMASO
- Page 581 and 582:
Section 613Remove efflorescence wit
- Page 583 and 584:
Section 614.) LEAN CONCRETE BACKFIL
- Page 585 and 586:
Section 615.) SIDEWALKS, DRIVE PADS
- Page 587 and 588:
Section 615615.07 Acceptance. Clay
- Page 589 and 590:
Section 616.) SLOPE PAVINGDescripti
- Page 591 and 592:
Section 616Slope paving constructio
- Page 593 and 594:
Section 617.) GUARDRAILDescription6
- Page 595 and 596:
Section 617Stamp the post length on
- Page 597 and 598:
Section 617Measure terminal section
- Page 599 and 600:
Section 618(b) Slip-formed. Do not
- Page 601 and 602:
Section 618Construction of concrete
- Page 603 and 604:
Section 619At bridges, cattle under
- Page 605 and 606:
Section 619Provide a concrete footi
- Page 607 and 608:
Section 619Splicing of barbed wire
- Page 609 and 610:
Section 619Where an electric line r
- Page 611 and 612:
Section 619Payment619.11 The accept
- Page 613 and 614:
Section 620Perform excavation and b
- Page 615 and 616:
Section 620(c) Coping. Construct co
- Page 617 and 618:
Section 620For filled spandrel arch
- Page 619 and 620:
Table 620-2Sampling and Testing603M
- Page 621 and 622:
Section 621Measurement621.05 Measur
- Page 623 and 624:
Section 622Payment622.05 The accept
- Page 625 and 626:
Section 624.) TOPSOILDescription624
- Page 627 and 628:
Section 625.) TURF ESTABLISHMENTDes
- Page 629 and 630:
Section 625Mulch by hand areas inac
- Page 631 and 632:
Section 626.) PLANTS, TREES, SHRUBS
- Page 633 and 634:
Section 626Loosen soil at the sidew
- Page 635 and 636:
Section 626626.15 Measure plants by
- Page 637 and 638:
Section 627627.06 Placing Sod. Plac
- Page 639 and 640:
Section 628.) SPRIGGINGDescription6
- Page 641 and 642:
Section 628Payment628.10 The accept
- Page 643 and 644:
Section 629For swale or ditch insta
- Page 645 and 646:
Section 629Sections 630, 631, and 6
- Page 647 and 648:
Section 633633.04 Supports. Sign lo
- Page 649 and 650:
Section 633Measure object markers a
- Page 651 and 652:
Section 634Construction Requirement
- Page 653 and 654:
Section 634Type E. Use two bead dis
- Page 655 and 656:
Section 634Measurement634.13 Measur
- Page 657 and 658:
Section 635(e) Immediately replace
- Page 659 and 660:
Section 635(b) Traffic paint. Do no
- Page 661 and 662:
Section 635(e) After installing all
- Page 663 and 664:
Section 635Furnish signal heads wit
- Page 665 and 666:
Section 635When temporary pavement
- Page 667 and 668:
Section 635Payment will be made und
- Page 669 and 670:
Section 636Remove structures and ob
- Page 671 and 672:
Section 636After energizing the sys
- Page 673 and 674:
SECTION 637. ) FACILITIES AND SERVI
- Page 675 and 676:
Table 637-2Minimum Facility Furnish
- Page 677 and 678:
DIVISION 700Material661
- Page 679 and 680:
Section 702.) ASPHALT MATERIAL702.0
- Page 681 and 682:
Section 702(c) Waterproofing fabric
- Page 683 and 684:
Section 703.) AGGREGATE703.01 Fine
- Page 685 and 686:
669Table 703 - 2Target Value Ranges
- Page 687 and 688:
Section 703703.07 Hot Asphalt Concr
- Page 689 and 690:
Section 703703.09 Emulsified Asphal
- Page 691 and 692:
Section 703Table 703-6Target Value
- Page 693 and 694:
Section 703703.11 Slurry Seal Aggre
- Page 695 and 696:
Section 703703.16 Aggregate for Lea
- Page 697 and 698:
Section 703Table 703-14Superpave Gr
- Page 699 and 700:
Section 703Table 703-16Superpave Gr
- Page 701 and 702:
Section 704704.05 Topping. Furnish
- Page 703 and 704:
Section 704(3) Sodium sulfate sound
- Page 705 and 706:
Section 705.- ROCK705.01 Gabion and
- Page 707 and 708:
Section 705705.03 Rock for Masonry
- Page 709 and 710:
Section 705(2) Medium pointed (M.P.
- Page 711 and 712:
Section 705Saw, point, or smooth qu
- Page 713 and 714:
Section 706(c) Profile wall (ribbed
- Page 715 and 716:
Section 707707.06 Aluminum-Alloy St
- Page 717 and 718:
Section 708.) PAINT708.01 General.
- Page 719 and 720:
Section 709.) REINFORCING STEEL AND
- Page 721 and 722:
709.03 Prestressing Steel. Fabricat
- Page 723 and 724:
Section 710710.06 Metal Beam Rail.(
- Page 725 and 726:
Section 711.) CONCRETE CURING MATER
- Page 727 and 728:
Section 712(3) Performed cork expan
- Page 729 and 730:
Section 712Table 712-2Backer Rod Si
- Page 731 and 732:
(e) Resistance to alkali (3) , ASTM
- Page 733 and 734:
Section 713Granulated slag or other
- Page 735 and 736:
Section 713(f) Mature compost. Furn
- Page 737 and 738:
Section 713Table 713-2Straw Erosion
- Page 739 and 740:
MaterialCoconut (1) 100%Table 713-4
- Page 741 and 742:
Section 713Table 713-7Synthetic Pol
- Page 743 and 744:
Section 713(e) Twine. Furnish 2-ply
- Page 745 and 746:
Section 713(c) Geotextile. Conform
- Page 747 and 748:
Section 714In addition, when geotex
- Page 749 and 750:
Table 714-2Physical Requirements Fo
- Page 751 and 752:
Table 714-5Physical Requirements Fo
- Page 753 and 754:
Section 714(b) Geocomposite sheet d
- Page 755 and 756:
Section 715Construct precast concre
- Page 757 and 758:
Section 715For copper-bearing struc
- Page 759 and 760:
Section 717.) STRUCTURAL METAL717.0
- Page 761 and 762:
Section 717717.08 Sheet Lead. Furni
- Page 763 and 764:
Section 717717.13 Aluminum Alloy fo
- Page 765 and 766:
RAILINGCOMPONENTASTM Specification
- Page 767 and 768:
Section 718718.02 Test Procedures.
- Page 769 and 770:
Section 718ASTM D 3841(10) Squarene
- Page 771 and 772:
Section 718Use opaque or transparen
- Page 773 and 774:
Section 718(e) Dry opacity. FTMS 14
- Page 775 and 776:
Section 718(j) Storage. When stored
- Page 777 and 778:
Section 718Table 718-3Minimum Coeff
- Page 779 and 780:
Section 720.) STRUCTURAL WALL ANDST
- Page 781 and 782:
Section 720(i) Reinforcing strips.
- Page 783 and 784:
(g) Brittleness temperature, ASTM D
- Page 785 and 786:
Section 721.) ELECTRICAL AND ILLUMI
- Page 787 and 788:
Section 721(k) Control cabinet. Fur
- Page 789 and 790:
Section 721(4) Elongation in 2 inch
- Page 791 and 792:
Section 722.) ANCHOR MATERIAL722.01
- Page 793 and 794:
Section 722(e) Grout. Furnish a pum
- Page 795 and 796:
Section 725725.05 Mineral Filler. C
- Page 797 and 798:
Section 725725.15 Polyvinyl Chlorid
- Page 799 and 800:
Section 725725.24 Color Coating. Fu
- Page 801 and 802:
) A )Abbreviations ................
- Page 803 and 804:
Asphalt (continued)pavement milling
- Page 805 and 806:
Centralizers ......................
- Page 807 and 808:
Corrosion resistant steel rail.....
- Page 809 and 810:
Equipment .........................
- Page 811 and 812:
Galvanized steel rail..............
- Page 813 and 814:
Jointmaterial .....................
- Page 815 and 816:
Mobilization ......................
- Page 817 and 818:
Paymentbond .......................
- Page 819 and 820:
Postdelineator ....................
- Page 821 and 822:
Rental equipment ..................
- Page 823 and 824:
Signal system .....................
- Page 825 and 826:
Structure excavation and backfill .
- Page 827 and 828:
Unit mass .........................
Inappropriate
Loading...
Inappropriate
You have already flagged this document.
Thank you, for helping us keep this platform clean.
The editors will have a look at it as soon as possible.
Mail this publication
Loading...
Embed
Loading...
Delete template?
Are you sure you want to delete your template?
DOWNLOAD ePAPER
This ePaper is currently not available for download.
You can find similar magazines on this topic below under ‘Recommendations’.