12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 203Place debris in alternating layers with earth material. Alternating layersconsist of 4 feet of debris covered with 2 feet of earth. Distribute stumps,logs, and other large pieces to form a dense mass and minimize air voids.Fill all voids. Cover the top layer of buried debris with at least 1 foot ofcompacted earth. Grade and shape the area.(d) Hazardous material. Furnish a copy of all disposal permits. Disposeof material according to <strong>Federal</strong>, state, and local regulations.203.06 Acceptance. Removal of structures and obstructions will be evaluatedunder Subsection 106.02.Backfilling and compacting cavities left by structures will be evaluated underSection 209.Concrete will be evaluated under Section 601.Measurement203.07 Measure removal of structures and obstructions by the each, by thelinear foot, by the square yard, or by the lump sum. Measure removal by thelinear foot and by the square yard before removal.Payment203.08 The accepted quantities, measured as provided above, will be paid atthe contract price per unit of measurement for the pay items listed below thatare shown in the bid schedule. Payment will be full compensation for thework prescribed in this Section. See Subsection 109.05.Payment will be made under:Pay ItemPay Unit20301 Removal (description) Each20302 Removal (description) Linear foot20303 Removal (description) Square yard20304 Removal (description) Lump sum20305 Removal of structures and obstructions Lump sum105

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!