12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 636.) SIGNAL, LIGHTING,AND ELECTRICAL SYSTEMSDescription636.01 This work consists of installing, modifying, or removing traffic signals,flashing beacons, highway lighting, sign illumination, communicationconduits, and electrical systems or provisions for future systems.Material636.02 Conform to the following Subsections:Backer rod712.01(g)Electrical material 721.01Lighting material 721.02Sealant712.01(a)Construction Requirements636.03 Regulations and Codes. Furnish material and workmanship conformingto the standards of the National Electrical Code, local safety code,UL, and the National Electrical Manufacturers Association.Obtain permits, arrange for inspections, and pay all fees necessary to obtainelectrical service.Notify the CO, local traffic enforcement agency, local utility company, orrailroad company 7 days before any operational shutdown to coordinate connectionsor disconnections to an existing utility or system.636.04 General. At the preconstruction conference, submit a certified costbreakdown of items involved in the lump sum for use in making progresspayments and price adjustments.Fifteen days before installation, submit a list of proposed equipment and material.Include the manufacturer's name, size, and identification number of eachitem. Supplement the list with scale drawings, catalog cuts, and wiring diagramsshowing locations and details of equipment and wiring.The CO will establish the exact locations of the systems.652

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!