12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 610Use unslotted pipe for the last 10 to 20 feet of the outlet end. Seal the spacebetween the drilled hole and the unslotted pipe for at least 10 feet at the outletend with an approved impermeable material. Do not seal the space betweenthe drilled hole and the slotted pipe.610.06 Installing Outlet Drains and Collector Systems. Attach outlet drainpipe to the ends of all horizontal drains by means of a tee or street ell. Installa collector system of the type, kind, and size detailed in the contract.610.07 Acceptance. Material furnished for horizontal drains will be evaluatedunder Subsections 106.02 and 106.03.Construction of horizontal drains will be evaluated under Subsections106.02 and 106.04.Measurement610.08 Measure horizontal drain pipe, including the length of the outlet pipe,by the linear foot.Measure the collector system by the linear foot or lump sum.Payment610.09 The accepted quantities, measured as provided above, will be paid atthe contract price per unit of measurement for the pay items listed below thatare shown in the bid schedule. Payment will be full compensation for thework prescribed in this Section. See Subsection 109.05.Payment will be made under:Pay ItemPay Unit61001 Horizontal drain pipe Linear foot61002 Collector system Linear foot61003 Collector system Lump sum556

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!