12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 257(b) Dimensions and schedules of all reinforcing steel including reinforcingbar bending details, dowels, and/or studs for attaching the facing.(c) Details and dimensions for foundations and leveling pads including stepsin the footings or leveling pads.(d) Details and dimensions for all:(1) Panels, modules, soldier piles, and lagging necessary to construct theelement(2) Reinforcing steel in the element(3) Location of mesh, strip attachment, or anchor devices embedded inthe panels(4) Anchors and soldier piling including the spacing and size of piles andthe spacing and angle of anchors(e) Details for constructing walls around drainage facilities.(f) Details for terminating walls and adjacent slope construction.(g) Architectural treatment details.(h) Design notes including an explanation of any symbols and computerprograms used in the design of the walls. Specify the factors of safety forsliding, pullout, and overturning. Specify the bearing pressure beneath thewall footing, stabilized earth mass, or soldier piles.(i) Verification of design criteria for the site specific wall locations with testprocedures, results, and interpretations. Include results from creep, durability,construction induced damage, and junction strength tests.(j) Other design calculations.Process all submissions through the Contractor unless the Contractor giveswritten permission for the wall designer/supplier and the CO to communicatedirectly.184

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!