12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 204(2) Earth. Earth is material containing less than 25 percent, by volume,rock particles greater than 4 inches in diameter.(d) Conserved topsoil. Excavated material conserved from the roadwayexcavation and embankment foundation areas that is suitable for growth ofgrass, cover crops, or native vegetation. A material reasonably free fromhard soil, rock, clay, toxic substances, litter, or other deleterious material.(e) Waste. Excess and unsuitable roadway excavation and subexcavationthat cannot be used.Material204.03 Conform to the following Subsections:Backfill material 704.03Select borrow 704.07Select topping 704.08Topping 704.05Unclassified borrow 704.06Water 725.01Construction Requirements204.04 Preparation for Roadway Excavation and EmbankmentConstruction. Clear the area of vegetation and obstructions according to Sections201 and 203.204.05 Conserved Topsoil. Conserve topsoil from roadway excavation andembankment foundation areas. Stockpile conserved topsoil in low windrowsimmediately beyond the rounding limits of cut and embankment slopes or inother approved locations. Separate topsoil from other excavated material.Place conserved topsoil on completed slopes according to Section 624.107

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!