12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 106When approved, it is permissible to voluntarily remove defective materialand replace it with new material to avoid or minimize a pay factor of lessthan 1.00. New material will be sampled, tested, and evaluated accordingto this Subsection.Any quantity of material that is determined to be defective may be rejectedbased on visual inspection or test results. Do not incorporate rejected materialin the work. The results of tests run on rejected material will be excludedfrom the lot.(c) Statistical evaluation. The Variability-Unknown/Standard DeviationMethod will be used to determine the estimated percentage of the lot that isoutside specification limits.The number of significant figures used in the calculations will be accordingto AASHTO R 11, absolute method.The estimated percentage of work that is outside of the specification limitsfor each quality characteristic will be determined as follows:(1) Calculate the arithmetic mean ( ¯X ) of the test values:¯X DxnWhere: D = summation ofx = individual test valuen = total number of test values(2) Calculate the standard deviation (s):s nD(x 2 ) (Dx) 2n(n1)Where: D(x 2 ) = summation of the squares of individualtest values(Dx) 2 = summation of the individual testvalues squared30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!