12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 402(b) Non-roadway paving. Compact by rolling with a hand-operated rollerweighing at least 300 pounds or with a small power roller.Compact areas that are not accessible to rollers by other approved methods.402.08 Pavement Smoothness. Use a 10-foot metal straightedge to measureat right angles and parallel to the centerline. Defective areas are surface deviationsin excess of 0.25 inches in 10 feet between any two contacts of thestraightedge with the surface. Correct defective areas using approvedmethods.402.09 Acceptance. Minor hot asphalt concrete mixture will be evaluatedunder Subsections 106.02 and 106.03.Minor hot asphalt concrete construction work will be evaluated under Subsections106.02 and 106.04. See Table 402-1 for minimum sampling andtesting requirements.Measurement402.10 Measure asphalt concrete by the ton.Payment402.11 The accepted quantities, measured as provided above, will be paid atthe contract price per unit of measurement for the pay item listed below thatis shown in the bid schedule. Payment will be full compensation for the workprescribed in this Section. See Subsection 109.05.Payment will be made under:Pay ItemPay Unit40201 Minor hot asphalt concrete Ton252

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!