12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 609Measurement609.10 Measure curb and combination curb and gutter, both new and reset,by the linear foot along the front face of the curb. Make no deduction inlength for drainage structures installed in the curb section or for driveway andhandicap access ramp openings where the gutter is carried across.Measure wheelstops, both new and reset, by the each.Measure bed course material by the ton or by the cubic yard in place.Payment609.11 The accepted quantities, measured as provided above, will be paid atthe contract price per unit of measurement for the pay items listed below thatare shown in the bid schedule. Payment will be full compensation for thework prescribed in this Section. See Subsection 109.05.Payment will be made under:Pay ItemPay Unit60901 Portland cement concrete curb, Linear foot___ inch depth60902 Portland cement concrete curb and Linear footgutter, ___ inch depth60903 Stone curb type ___, ___ inch depth Linear foot60904 Precast concrete curb Linear foot60905 Asphalt concrete curb, ___ inch depth Linear foot60906 Reset curb Linear foot60907 Bed course material Cubic yard60908 Bed course material Ton60909 Wheelstop Each60910 Remove and reset wheelstop Each553

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!