12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 413Mill the surface to a smoothness conforming to Subsection 402.08.Use a rotary broom and vacuum immediately behind the milling operations toremove and completely recover all loose material. Minimize the escape of dustinto the air. Dispose of recovered milled material according toSubsection 211.03(b).Before opening to traffic, patch milled travel lanes according to Subsection635.17.413.04 Acceptance. Asphalt pavement milling will be evaluated under Subsections106.02 and 106.04.Smoothness of milled surface will be evaluated under Section 402.Measurement413.05 Measure asphalt pavement milling by the square yard or by the station.Measure square yard width horizontally. Measure the length horizontallyalong the centerline of the roadway.Payment413.06 The accepted quantities, measured as provided above, will be paid atthe contract price per unit of measurement for the pay items listed below thatare shown in the bid schedule. Payments will be full compensation for thework prescribed in this Section. See Subsection 109.05.Payment will be made under:Pay ItemPay Unit41301 Asphalt pavement milling, ___ inch depth Square yard41302 Asphalt pavement milling, ___ inch depth Station306

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!