12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 203.) REMOVAL OF STRUCTURESAND OBSTRUCTIONSDescription203.01 This work consists of salvaging, removing, and disposing of buildings,fences, structures, pavements, culverts, utilities, curbs, sidewalks, and otherobstructions.Material203.02 Conform to the following Section and Subsection:Backfill material 704.03Concrete 601Construction Requirements203.03 Salvaging Material. Salvage, with reasonable care, all material designatedto be salvaged. Salvage in readily transportable sections or pieces.Replace or repair all members, pins, nuts, plates, and related hardware damaged,lost, or destroyed during the salvage operation. Wire all loose parts toadjacent members or pack them in sturdy boxes with the contents clearlymarked.Matchmark members of salvaged structures. Furnish one set of drawingsidentifying the members and their respective matchmarks.Stockpile salvaged material at a designated area on the project.203.04 Removing Material. Saw cut sidewalks, curbs, pavements, andstructures when partial removal is required.Construct structurally adequate debris shields to contain debris within theconstruction limits. Do not permit debris to enter waterways, travel lanes opento public traffic, or areas designated not to be disturbed.Raze and remove all buildings, foundations, pavements, sidewalks, curbs,fences, structures, and other obstructions interfering with the work and notdesignated to remain.103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!