12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 613Remove efflorescence with a pressure water wash. Use a fan nozzle heldperpendicular to the surface at a distance between 2 and 3 feet. Use a minimum2,900-pounds per square inch water pressure at a rate of 3 to 4 gallonsper minute. Do not sand blast surfaces that receive color/stain.Correct all surface irregularities created by the surface cleaning.Maintain the concrete temperature between 40 and 85 bF when applyingcolor/stain and for 48 hours after applying color/stain.Color/stain all exposed concrete surfaces. Use a color/stain application suitableto obtain the appearance of the native stone masonry. Use a minimum of3 colors/stains.When required at boundaries between two color tones or between surfacesreceiving color at different times, take care and provide protection to avoidover-spray and color overlap.Apply grout of a natural cement color to each form joint. Use sufficient groutso the over-spray of the color/stain is not visible. Give the form pattern groutjoint the appearance of mortared joints in completed masonry.Recoat all areas inconsistent with the approved test wall.Treat expansion joints with caulk/grout to blend with the appearance of theadjacent stone or mortar joint.613.09 Test Wall. Before production work on the simulated stone masonry,construct a 3-foot high, by 2-foot wide, by 10-foot-long test wall according toSection 552 and these specifications.Cast the test wall on site, using the same forming methods, procedures, formliner, texture configuration, expansion joint, concrete mixture, and color/stainapplication proposed for the production work. Demonstrate the quality andconsistency of joint treatment, end treatment, top embossing methods, backtreatment, and color/stain application on the test wall. If a test wall is unacceptable,construct a new test wall.Begin production structural concrete work only after the test wall is approved.Begin production color/stain application only after the color/stain applicationon the test wall is approved. Dispose of the test wall after use.565

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!