12.07.2015 Views

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

FP-96 English Version - Eastern Federal Lands Highway Division

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 552Place underwater concrete continuously from start to finish in a dense mass.Place each succeeding layer of concrete before the preceding layer has takeninitial set. Use more than one tremie or pump as necessary to ensure compliancewith this requirement. Keep the concrete surface as horizontal aspracticable. Do not disturb after placement. Maintain still water at the pointof deposit.Dewater after test specimens cured under similar conditions indicate that theconcrete has sufficient strength to resist the expected loads. Remove alllaitance or other unsatisfactory material from the exposed concrete.(f) Concrete railings and parapets. Use smooth, tight fitting, rigid forms.Neatly miter corners. Place concrete railings and parapets after the centeringor falsework for the supporting span is released. Remove forms withoutdamaging the concrete. Finish all corners to be true, clean-cut, and free fromcracks, spalls, or other defects.Cast precast railing members in mortar-tight forms. Remove precast membersfrom molds as soon as the concrete has sufficient strength to be selfsupporting.Protect edges and corners from chipping, cracking, and otherdamage. Cure in accordance with Subsection 552.15(b). The curing periodmay be shortened, as approved, by using moist heat and/or type III cementor water reducing agents.552.12 Construction Joints. Provide construction joints at locations shownon the plans. Written approval is required for any additional constructionjoints.At horizontal construction joints, place gauge strips inside the forms along allexposed faces to produce straight joint lines. Clean and saturate constructionjoints before placing fresh concrete. Keep joints saturated until adjacent freshconcrete is placed. Immediately before placing new concrete, draw formstightly against previously placed concrete. Where accessible, thoroughly coatthe existing surface with a very thin coating of cement mortar. Extendreinforcing bars across construction joints.389

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!