07.01.2013 Views

02 - BTI - We know your business

02 - BTI - We know your business

02 - BTI - We know your business

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WWW.bTI-gROUP.COM<br />

08<br />

A<br />

�����<br />

Primer S4<strong>02</strong> plastic<br />

CARE + CLEANING<br />

Ready-for-use pre-coating for silicone sealing compounds for improved sealing on plastic<br />

Increases adhesion of the sealing compound on<br />

the surface<br />

Ensure secure adhesion of the sealing compound<br />

with joints, which are subject to constant<br />

movement or changing climate conditions<br />

Range of application:<br />

For all plastics with insufficient adhesion such as ABS<br />

plastic, polyester and acrylic; not suitable for Makrolon,<br />

PE, PP and Teflon; only suitable for silicone sealing<br />

compounds<br />

Processing instructions:<br />

The surface adhesions must be clean, dry, stable and<br />

free of grease; remove loose parts; apply undiluted<br />

with brush in sufficient amount. After use wait at least<br />

15 minutes before applying sealing compound. Tools<br />

can be cleaned immediately after use with white spirit.<br />

Primer S403 PU<br />

Ready-for-use pre-coating for polyutherane and polysulfide<br />

Increases adhesion of the sealing compound on<br />

the surface<br />

Ensure secure adhesion of the sealing compound<br />

with joints, which are subject to constant<br />

movement or changing climate conditions<br />

Range of application:<br />

For improved adhesion on porous surfaces such as<br />

concrete, masonry, lime sand brick, plaster walls,<br />

plaster cardboard plates, gas concrete and wood<br />

Processing instructions:<br />

The surface adhesions must be clean, dry, stable and<br />

free of grease; remove loose parts; apply undiluted<br />

with brush in sufficient amount. After application wait<br />

at least one hour but no longer than 4 hours until the<br />

sealing compound is applied. If the maximum airing time<br />

has passed a new layer of primer should be applied.<br />

Technical data<br />

Usage temperature +5 °C to +25 °C<br />

Drying time approx. 10 min<br />

Usage approx. 0.2 l/m²<br />

Shelf life at +20 °C 12 months in sealed<br />

containers<br />

Item Unit Designation Content<br />

number Pieces l<br />

011526 1 Primer S4<strong>02</strong> plastic 1<br />

08-154 A/P/T 08154AA<br />

Technical data<br />

Usage temperature +5 °C to +25 °C<br />

Drying time approx. 60 min<br />

Usage approx. 0.2 l/m²<br />

Shelf life at +20 °C 6 months in sealed<br />

containers<br />

Item Unit Designation Content<br />

number Pieces l<br />

011528 1 primer S403 PU 1<br />

08-154 A/P/T 08154AA<br />

The details specified in this publication are based on our current <strong>know</strong>ledge and experience. Due to the abundance of possible processing and application influences this information does not release the processor from performing his<br />

568 own tests and trials. Legally binding assurance of certain characteristics or suitability for a concrete implementation objective can not be derived from this information.<br />

1006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!