22.03.2014 Views

Biological Opinions - Bureau of Reclamation

Biological Opinions - Bureau of Reclamation

Biological Opinions - Bureau of Reclamation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 12.6. Summary <strong>of</strong> risks resulting from the proposed action to coho salmon life stages.<br />

Potential<br />

Stressor<br />

Habitat<br />

Reduction<br />

Disease<br />

(C. shasta)<br />

Elevated water<br />

temperature<br />

DO reduction<br />

Decreased<br />

outmigration<br />

rates<br />

12.4.2 Restoration Activities<br />

Project Effects Life Stage General Time Mainstem Location<br />

Increased likelihood <strong>of</strong><br />

reduced growth or survival<br />

to some individuals<br />

Increased likelihood <strong>of</strong><br />

impaired growth, swimming<br />

performance, body<br />

condition, and increased<br />

stress and susceptibility to<br />

secondary infections<br />

Increased likelihood <strong>of</strong><br />

disease-related mortality<br />

Increased stress<br />

Decreased swimming<br />

performance and increased<br />

stress<br />

Increased likelihood <strong>of</strong><br />

mortality from other<br />

stressors in the mainstem<br />

Klamath River (e.g., disease,<br />

predation, impaired water<br />

quality)<br />

356<br />

Fry<br />

Parr and<br />

Smolts<br />

Fry<br />

Parr<br />

Smolts<br />

Fry<br />

Parr, and<br />

Smolts<br />

Fry<br />

Parr and<br />

Smolts<br />

Parr<br />

Smolts<br />

Late March to<br />

mid-June<br />

March to June<br />

April to mid-<br />

June<br />

April to August<br />

April to June<br />

May to mid-<br />

June<br />

May to June<br />

May to mid-<br />

June<br />

May to June<br />

June to August<br />

April to June<br />

IGD (RM 190) to<br />

Salmon River (RM<br />

66)<br />

Trees <strong>of</strong> Heaven (RM<br />

172) to Rogers Creek<br />

(RM 72)<br />

Klamathon Bridge<br />

(RM 187.6) to<br />

Orleans (RM 59)<br />

Trees <strong>of</strong> Heaven (RM<br />

172) to Seiad Valley<br />

(RM 129)<br />

IGD to Scott River<br />

(RM 143)<br />

IGD (RM 190) to<br />

Orleans (RM 59)<br />

IGD (RM 190) to<br />

Shasta River (RM<br />

176)<br />

Restoration activities that require instream activities will be implemented during low flow<br />

periods between June 15 and November 1. The specific timing and duration <strong>of</strong> each individual<br />

restoration project will vary depending on the project type, specific project methods, and site<br />

conditions. However, the duration and magnitude <strong>of</strong> effects to coho salmon and their designated<br />

critical habitat associated with implementation <strong>of</strong> individual restoration projects will be<br />

significantly minimized due to the multiple proposed avoidance and minimization measures.<br />

Implementing individual restoration projects during the summer low-flow period will<br />

significantly minimize exposure to emigrating coho salmon smolts and coho salmon adults at all<br />

habitat restoration project sites. The total number and location <strong>of</strong> restoration projects funded

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!