Table 13.8 Schedule Summary for LRS and SNS Term and Conditions, Mandatory Monitoring, and Reporting Requirements.<br />

T&C or<br />

Mandatory<br />

Monitoring<br />

T&C 1b<br />

T&C 1d<br />

T&C 1e<br />

T&C 1f<br />

Mandatory<br />

Monitoring 1a<br />

Mandatory<br />

Monitoring 1b<br />

.<br />

Title <strong>of</strong> Requirement<br />

Assess Water Levels at<br />

Project Facilities at<br />

Clear Lake, Gerber<br />

Reservoir, and Tule<br />

Lake<br />

Activate A Canal<br />

Pumped-bypass System<br />

Optimize Salvage <strong>of</strong><br />

Suckers in Project<br />

Canals<br />

Maximize Adult Listed<br />

Sucker Relocation<br />

Efforts at Lake Ewauna<br />

A Canal Fish Evaluation<br />

Station Entrainment<br />

Monitoring<br />

Flow Monitoring at A<br />

Canal, and Link River,<br />

Clear Lake, and Gerber<br />

Dams as a Surrogate for<br />

Larval Sucker<br />

Entrainment Monitoring<br />

Start<br />

Date<br />

No later<br />

than<br />

August 1<br />

End Date<br />

Interval<br />

Weekly<br />

Annually<br />

Annually<br />

April 1 May 31 Annually<br />

August 1<br />

September<br />

30<br />

3 to 5<br />

nights/<br />

week<br />

Draft Plan<br />

Due Date<br />

September<br />

1<br />

July 1,<br />

2013<br />

Final<br />

Plan Due<br />

Date<br />

November<br />

1<br />

March 1<br />

Notes<br />

Assess water levels at, Clear Lake,<br />

Gerber Reservoir, and Tule Lake Sump<br />

1A.<br />

Convene meeting with USFWS<br />

immediately if projected to reach<br />

minimums.<br />

Consult weekly with USFWS to<br />

determine if appropriate to turn on<br />

pump-based system <strong>of</strong> the FES.<br />

Activate to run continuously no later<br />

than August 1 and continue until no<br />

age-0 suckers are observed or until the<br />

A Canal diversions are terminated.<br />

Starting in 2013, begin salvage as early<br />

as soon as conditions allow.<br />

Work efficiently to maximize sucker<br />

relocation efforts while minimizing risks<br />

to suckers.<br />

Begin August 1, 2013 and continue to<br />

March 31, 2023<br />

April 1 July 15 Annually N/A N/A Begin June 15, 2013.<br />

403