Table 4.5. Calculation <strong>of</strong> fall/winter Link River Dam target releases.<br />

Condition<br />

Equation<br />

October through November 15<br />

November 16 through 30,<br />

Upper Klamath<br />

Lake_cum_inf_ind < 0.3 (dry)<br />

November 16 through 30,<br />

Upper Klamath<br />

Lake_cum_inf_ind > 0.3 (wet)<br />

December through February,<br />

Upper Klamath<br />

Lake_cum_inf_ind < 0.3 (dry)<br />

December through February,<br />

Upper Klamath<br />

Lake_cum_inf_ind > 0.3 (wet)<br />

(Will_prop * Will_Riv_inf -1 * Accrete_adjust) +<br />

OctNov_augment<br />

(Will_prop * Will_Riv_inf -1 * Fill_rate_adjust *<br />

Accrete_adjust) + OctNov_augment<br />

(Will_prop * Will_Riv_inf -1 * Fill_rate_adjust) +<br />

OctNov_augment<br />

Will_prop * Will_Riv_inf -1 * Fill_rate_adjust * Accrete_adjust<br />

Will_prop * Will_Riv_inf -1 * Fill_rate_adjust<br />

“Upper Klamath Lake_cum_inf_ind” is the UKL cumulative inflow index.<br />

“Will_prop” is the proportion <strong>of</strong> yesterday’s Williamson River flow targeted for release from<br />

Link River Dam.<br />

“Will_Riv_inf -1 ” is the Williamson River average flow cubic feet per second the previous day.<br />

“Accrete_adjust” is an adjustment to the Link River Dam release based on net accretions<br />

between Link River Dam and Iron Gate Dam.<br />

“OctNov_augment” is based on the volume, if any, <strong>of</strong> the EWA that was carried over from the<br />

previous spring/summer season. The carryover volume is distributed during October and<br />

November.<br />

“Fill_rate_adjust” changes the proportion <strong>of</strong> the Williamson River flow intended for release at<br />

Link River Dam from November 16 through February to account for the fill trajectory <strong>of</strong> UKL.<br />

The fall/winter management steps and Link River Dam release factors are summarized in Table<br />

4.6.<br />