22.03.2014 Views

Biological Opinions - Bureau of Reclamation

Biological Opinions - Bureau of Reclamation

Biological Opinions - Bureau of Reclamation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 13.9 Summary <strong>of</strong> reporting and other communication requirements necessary to implement Terms and Conditions, and meet reporting<br />

requirements associated with Incidental Take and Term and Condition Monitoring.<br />

Title <strong>of</strong><br />

Requirement<br />

Annual Monitoring<br />

Report<br />

A Canal FES<br />

Monitoring Annual<br />

Report<br />

Requirement<br />

Reference<br />

Section 13.4.3<br />

Reporting<br />

Requirements<br />

Monitoring<br />

and Reporting<br />

Requirement<br />

1.1b<br />

Monitoring<br />

and Reporting<br />

Requirement<br />

3.3c<br />

Monitoring<br />

and Reporting<br />

Requirement<br />

3.3d<br />

Monitoring<br />

and Reporting<br />

Requirement<br />

3.3e<br />

Monitoring<br />

and Reporting<br />

Requirement<br />

1.1a<br />

Required Components Due Date Notes<br />

(1)Progress on implementation <strong>of</strong> EWA;<br />

(2)Progress on implementation <strong>of</strong> T&Cs;<br />

(3)Progress on budgeting for<br />

implementation <strong>of</strong> T&Cs;<br />

(4)Progress on implementation <strong>of</strong><br />

Conservation Measures<br />

Flow data, reported as acre-feet per day<br />

through A-Canal and Link River Dam<br />

Summary <strong>of</strong> QA/QC compliance<br />

Summary <strong>of</strong> reservoir water level and<br />

flow monitoring compliance<br />

Summary <strong>of</strong> progress on identification<br />

and installation <strong>of</strong> needed gages<br />

Methods, results, and recommendations to<br />

improve monitoring<br />

March 1<br />

March 1<br />

Develop acceptable format in coordination<br />

with USFWS no later than October 1, 2013<br />

First report due March 1, 2014.<br />

Included in body <strong>of</strong> annual monitoring report.<br />

Additional technical requirements included in<br />

text.<br />

Included in body <strong>of</strong> annual monitoring report.<br />

Additional technical requirements included in<br />

text.<br />

Included in body <strong>of</strong> annual monitoring report.<br />

Additional technical requirements included in<br />

text.<br />

Included in body <strong>of</strong> annual monitoring report.<br />

Additional technical requirements included in<br />

text.<br />

Additional technical requirements included in<br />

text.<br />

The USFWS agreed that the A Canal FES<br />

Monitoring Annual Report would be a<br />

component <strong>of</strong> the overarching Annual<br />

Monitoring Report.<br />

406

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!