28.11.2014 Views

ts_125331v120300p

ts_125331v120300p

ts_125331v120300p

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3GPP TS 25.331 version 12.3.0 Release 12<br />

141<br />

ETSI TS 125 331 V12.3.0 (2014-10)<br />

If the UE signals a value in the "E-DCH physical layer category extension 2" IE, it shall signal an "E-DCH physical<br />

layer category" of 6.<br />

If the UE suppor<strong>ts</strong> 64QAM in the uplink, the UE shall signal a value of 10 in the "E-DCH physical layer category<br />

extension 3" IE.<br />

If the UE suppor<strong>ts</strong> UL MIMO, the UE shall signal a value of 11 in the "E-DCH physical layer category extension 3" IE.<br />

If the UE suppor<strong>ts</strong> 64QAM in the uplink and UL MIMO, the UE shall signal a value of 12 in the "E-DCH physical layer<br />

category extension 3" IE<br />

If the UE signals a value in the "E-DCH physical layer category extension 3", it shall signal an "E-DCH physical layer<br />

category" of 7.<br />

8.1.6.3 Reception of a UE CAPABILITY INFORMATION message by the UTRAN<br />

Upon reception of a UE CAPABILITY INFORMATION message, the UTRAN should transmit a UE CAPABILITY<br />

INFORMATION CONFIRM message on the downlink DCCH using UM or AM RLC. After the UE CAPABILITY<br />

INFORMATION CONFIRM message has been submitted to the lower layers for transmission, the procedure is<br />

complete.<br />

If the received UE CAPABILITY INFORMATION message indicates capabilities that would be insufficient for the UE<br />

to continue in an ongoing service, the UTRAN may reconfigure the bearers for the ongoing service. In such a case, if<br />

the UTRAN does not perform such a reconfiguration, it should set the IE "Acceptance of requested change of<br />

capability" to "Refused" in the UE CAPABILITY INFORMATION CONFIRM message.<br />

8.1.6.4 Reception of the UE CAPABILITY INFORMATION CONFIRM message by<br />

the UE<br />

Upon reception of a UE CAPABILITY INFORMATION CONFIRM message, the UE shall:<br />

1> stop timer T304;<br />

1> if there is an entry for the UE CAPABILITY ENQUIRY message is present in the table "Accepted transactions"<br />

in the variable TRANSACTIONS:<br />

2> clear that entry.<br />

1> if the IE "Acceptance of requested change of capability" is included and set to "Accepted":<br />

2> update i<strong>ts</strong> variable UE_CAPABILITY_TRANSFERRED with the UE capabilities it has last transmitted to<br />

the UTRAN during the current RRC connection.<br />

1> if the IE "Acceptance of requested change of capability" is included and set to "Accepted with reconfiguration to<br />

follow":<br />

2> when a reconfiguration message with the flag "Reconfiguration in response to requested change of UE<br />

capability" set to TRUE, update i<strong>ts</strong> variable UE_CAPABILITY_TRANSFERRED with the UE capabilities it<br />

has last transmitted to the UTRAN during the current RRC connection;<br />

2> if a reconfiguration message with the flag "Reconfiguration in response to requested change of UE<br />

capability" set to TRUE it is not received by the UE within a time determined by the implementation, the UE<br />

shall consider the change of capabilities to be refused by the UTRAN.<br />

1> if the IE "Acceptance of requested change of capability" is included and set to "Refused":<br />

2> consider the request for a change of capabilities to be refused;<br />

2> wait at least 300 seconds before transmitting another such request.<br />

1> clear the variable UE_CAPABILITY_REQUESTED;<br />

1> and the procedure ends.<br />

ETSI

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!